Lesson 6.3: Human in the loop: approvals, review and hand-back
Learn where people belong in an agent's work: approval gates, risk tiers, review that people can actually do, and how an agent hands a task back well.
By the end of this lesson you will be able to decide which of an agent's actions need a person's approval, sort actions into risk tiers, design an approval request that a busy person can judge in seconds, estimate how many reviewers a design needs, avoid the rubber-stamp trap, and write the hand-back an agent gives when it cannot continue. You will work out that for 200 actions a day with a 4 per cent error rate, reviewing everything cuts a ₹40,000 daily loss to ₹12,000, while reviewing only the riskiest 25 per cent cuts it to ₹9,600 and needs a quarter of the reviewer time. You should have read Lessons 1.3, 5.3 and 6.1. No code is needed. The mathematics is multiplication and percentages.
Earlier lessons set one idea against another: an agent is useful because it acts without being told every step, and it is dangerous for the same reason. The usual way to reconcile them is to keep a person involved at the points that matter. This is called human in the loop. It sounds simple and is not. A person who is asked to approve every action soon approves without reading. A person who is never asked will not notice what goes wrong. The skill is to place people in the right places, give them what they need to decide quickly and well, and measure whether it works.
Four ways a person can be involved
People can be placed in an agent's work in different positions, and each suits a different level of risk.
Position · What the person does · Example · SuitsApproves before · Agent proposes an action and waits. The action happens only after a yes · Agent drafts a refund, a person clicks approve, then it is issued · Actions that are costly or hard to undo
Reviews after · Agent acts. A person looks at results later, often a sample, and can undo · Agent files tickets. A person checks 10 per cent each day · Actions that are cheap to undo, in volume
Monitors · Agent acts. A person watches dashboards and alerts and can stop it · A fleet of agents answering routine queries · Low-risk work at scale
Takes over · Agent stops and hands the task to a person who finishes it · Agent cannot resolve a complaint and passes it on · Cases outside the agent's competence
Most designs use all four for different parts of the work. The mistake is to use only the first, everywhere, since it feels safest and rarely is.
Sorting actions into risk tiers
The sensible way to decide where a person belongs is to sort the agent's actions by what could go wrong. Two questions place any action.
How bad is a mistake? Think in money, harm to a person, damage to reputation and legal exposure.
How easily can it be undone? A draft can be deleted. A message sent to a customer cannot be unsent. A payment may be reversed with effort, or not at all.
Combine them into three tiers.
Tier 1: free. Reads, drafts, calculations and internal notes. A mistake costs little and is easy to correct. The agent acts without asking. It still logs what it did.
Tier 2: reviewed after, or limited. Actions that are reversible or small: changing a ticket's status, adding a tag, sending an internal message, issuing a refund under a small limit. The agent acts, a person samples the results and the agent is stopped from doing more than the limit allows.
Tier 3: approved before. Actions that are costly, external or irreversible: payments above a limit, deleting data, sending a message to a customer or regulator, changing permissions, signing anything. The agent prepares the action and a person approves it.
Where an action falls can depend on its size, not only its kind. A refund of ₹200 may be tier 2 and a refund of ₹20,000 tier 3. State the thresholds in numbers, and enforce them in the tool, as Lesson 6.1 argued. A rule that "large refunds need approval" in the instructions is not a control. A tool that refuses a refund above ₹2,000 without an approval token is.
What a person should see
An approval is a decision made quickly by someone with limited time. The quality of the decision depends almost entirely on what is put in front of them. A poor approval request is a wall of text and a button. A good one lets a person decide in about thirty seconds. It has six parts.
Part · Why it matters · ExampleThe action, plainly · The person must know exactly what will happen · "Refund ₹2,400 to the card ending 4417 for order 5521"
Why · The reasoning in a line or two · "Item arrived damaged. Photo attached. Policy allows refunds for damage within 7 days."
The evidence · Links or excerpts so the claim can be checked · Photo, delivery record, policy clause
What could go wrong · The risk, stated honestly · "Customer has had two refunds this quarter"
The alternatives · What else was considered · "Replacement was offered and declined"
A clear choice · Approve, reject, or edit, with the effect of each · Buttons that say what happens
Two further habits help. Put the most important fact first, since people read the top. And show the agent's confidence or uncertainty honestly, including what it could not check, so that the person knows where to look. An agent that says "I could not verify the delivery date" is more useful than one that presents a clean case.
Also let the person edit, not only accept or reject. If a draft reply is nearly right, a person will fix a word faster than they will reject it and wait for another. Edits are also a valuable signal: they show what the agent gets wrong.
The rubber-stamp trap
Human review is only worth something if people really review. In practice, it degrades. When a person sees hundreds of requests and nearly all are correct, they stop reading. Approval turns into clicking. The system looks safe, with a person in the loop, and is not. This is sometimes called approval fatigue or automation complacency, and it is among the most common failures of human-in-the-loop designs.
The warning signs are easy to measure. Look at the approval rate: if people approve 99.5 per cent of requests, either the agent is nearly perfect or they are not looking. Look at the time per decision: if the median is two seconds on a request that needs thirty, they are not reading. Look at whether reviewers ever reject anything.
Four design choices fight fatigue.
Ask less, but ask the right things. Send only the cases that need judgment. If most requests go through review and nearly all are approved, the review is a toll booth. Reserve approval for tier 3 and for cases the agent itself flags as uncertain.
Make the decision easy. The six-part request above lets a person judge quickly, which supports real attention.
Plant tests. Occasionally insert a known-bad request, one with a deliberate error, and check that reviewers reject it. If they do not, the review is not working. Tell reviewers that such tests exist, so that they know someone is watching the reviewers too.
Limit the load. A person can review carefully only so many items an hour. Set the volume to fit that, with breaks, and not to fit what the system happens to produce.
What review costs, and what it saves
Review costs people's time, and the benefit is mistakes caught. A short calculation shows how to weigh them. Suppose an agent takes 200 actions a day. 4 per cent are wrong, and each wrong action costs ₹5,000 on average. A review takes about 2 minutes, which at a loaded cost of ₹1,200 an hour is ₹40. A reviewer catches 90 per cent of the errors they see.
No review. Errors per day are 200 × 0.04 = 8. They cost 8 × ₹5,000 = ₹40,000 a day.
Review everything. Review costs 200 × ₹40 = ₹8,000. The errors that slip through are 8 × 0.10 = 0.8, costing ₹4,000. The total is ₹12,000, a saving of ₹28,000 a day.
Review a triaged quarter. Suppose a flag, based on the action's tier or the agent's uncertainty, picks out 25 per cent of actions, and these contain 90 per cent of the errors. Review costs 50 × ₹40 = ₹2,000. Errors in the flagged set are 8 × 0.9 = 7.2, of which review misses 10 per cent: 0.72. Errors in the unflagged 75 per cent are 8 × 0.1 = 0.8, all missed. Total missed is 1.52, costing ₹7,600. The total is ₹9,600.
Triage beats reviewing everything, in this example, on both cost and on reviewer time. It uses one quarter of the review effort. But it depends on the flag being good. If the flagged quarter holds only 60 per cent of the errors, the missed errors rise to 8 × (0.6 × 0.1 + 0.4) = 3.68, costing ₹18,400, and the total becomes ₹20,400, which is worse than reviewing everything. A triage rule must be measured, not assumed.
Predict first: with 200 actions a day, a 4 per cent error rate, ₹5,000 per error, ₹40 per review and a 90 per cent catch rate, which costs least: no review, reviewing everything or reviewing a flagged quarter that holds 90 per cent of the errors? Decide before looking at the answer.
How many reviewers?
Review also needs capacity. At 3 minutes per item, 200 items a day is 600 minutes, or 10 hours. A reviewer who can give 6 focused hours a day covers 360 minutes, so you need 1.67 reviewers. With triage, 50 items is 150 minutes, or 0.42 of a reviewer. If you plan for review but do not staff it, the queue grows, items wait, and either the agent stalls or people approve in bulk. Compute the load before you commit.
Approval that cannot be bypassed
An approval gate must be real. Four properties make it so.
The gate is in the tool, not the instructions. The write tool refuses to run without an approval token. The agent cannot reach the action by phrasing it differently.
The approval is tied to the exact action. A person who approves "refund ₹2,400 to card 4417" has not approved "refund ₹24,000 to card 9902". The token should be bound to the specific parameters, and any change should require a new approval.
The approver is the right person. Someone with the authority to approve this action, and who is not the person who requested it. For high-value actions, require two people.
Approvals expire. An approval given at 10 a.m. should not allow an action at 4 p.m. after circumstances have changed.
When the agent hands back
Sometimes the agent should stop and give the task to a person, as Lesson 5.3 said about escalation. This is a normal outcome, and a good one if done well. A poor hand-back is "I couldn't do this." A good one lets the person pick up without starting again. It has the same structure as a hand-off record between agents:
What was asked, in the user's terms.
What the agent did, with results and evidence.
Where it stopped, and why. For example, "the refund exceeds my limit", "the two sources disagree" or "the customer is asking for something outside policy".
What it recommends, if it has a view, clearly labelled as a recommendation.
What the person needs to decide or do, as a specific next step.
What the customer has been told, so the person does not contradict it.
The agent should hand back when: it reaches its authority limit, it is uncertain, the stakes are high, the user asks for a person, or something unexpected happens. The user should be told honestly that a person is taking over, and roughly when to expect a reply.
A hand-back also needs a rule about waiting. If no person responds within an hour, what happens? The agent might reassure the customer and escalate to a supervisor. It should not quietly give up or act without approval. Define the clock for every approval and hand-back.
Learning from the people in the loop
Every approval, rejection and edit is information. If reviewers keep changing the same part of the agent's draft, fix the agent's instructions. If they keep rejecting one kind of request, add a rule or move that kind to tier 3. If they approve one kind every time for months, consider moving it to tier 2, with sampling. Keep a log of each decision with the reason, even a one-click reason code, such as "wrong amount", "missing evidence" or "policy". Review the log monthly. This is how a human-in-the-loop system improves and how autonomy is widened safely, one measured step at a time.
Three worked examples
Example 1: refunds in three tiers
A support agent can issue refunds. Under ₹500, it acts and logs the refund, tier 1 with a daily cap of ₹20,000 enforced in the tool. From ₹500 to ₹5,000, it acts and a person samples 10 per cent of them the next day, tier 2. Above ₹5,000, or whenever the customer has had more than two refunds in a quarter, the tool refuses until a supervisor approves, tier 3. The approval screen shows the six parts and the supervisor can edit the amount. After three months the team finds that supervisors approved 98 per cent of tier 3 requests under ₹8,000 and moves that threshold up, keeping a sample.
Example 2: catching a rubber stamp
A bank has an agent that proposes responses to complaints, and each is approved by a person. The approval rate is 99.8 per cent and the median decision time is 4 seconds. The team plants ten deliberately wrong drafts over a week, such as one quoting the wrong fee. Reviewers reject only two. The team finds the queue holds 400 items a day per reviewer. They cut the queue by sending only complaints involving money or a regulator to approval and sampling the rest, and rebuild the screen to show the key facts and a diff of what the agent changed from the template. In the next test, reviewers reject eight of ten planted errors.
Example 3: a good hand-back
An agent handling an insurance query finds that the policy wording is ambiguous on whether a repair is covered. It stops and hands back: "The customer asks whether water damage from a burst pipe is covered under policy P-7712. I found clause 4.2 (accidental damage, covered) and clause 9.1 (gradual leakage, excluded). The cause is unclear from the photos. I recommend asking for a plumber's report. A claims officer should decide. I have told the customer that a person will respond within one working day and have not stated a decision." The officer reads it in a minute, requests the report and avoids contradicting what the customer was told.
A checklist for human in the loop
1. List every action the agent can take. Place each in a tier by how bad a mistake is and how easily it is undone.
2. State thresholds in numbers, and enforce them in the tools.
3. For tier 3, design the approval request with the six parts and allow edits.
4. Estimate the review load and the number of reviewers. Staff it.
5. Choose a triage flag, and measure how many errors it catches.
6. Measure approval rate, time per decision and rejection rate. Plant tests.
7. Make approvals specific, expiring and made by the right person.
8. Define the hand-back format and the clock for every wait.
9. Log decisions with reasons, review monthly and move actions between tiers on evidence.
Common mistakes
Approving everything. People stop reading. Ask only where judgment is needed.
Approving nothing. Costly and irreversible actions need a gate.
Gates in the prompt. Enforce in the tool.
Walls of text. Put the action, reason and evidence in front of the person in a form they can judge in seconds.
Accept or reject only. Allow edits, and learn from them.
Unstaffed review. Compute the load.
Untested triage. A weak flag can be worse than reviewing everything.
Approvals that last forever or cover too much. Bind them to the action and give them an expiry.
A vague hand-back. Say what was done, where it stopped, why and what is needed.
Never revisiting the tiers. Use the log to widen or narrow autonomy.
Key takeaways
A person can approve before, review after, monitor or take over. Use each where it fits.
Sort actions into tiers by the cost of a mistake and how easily it can be undone, with numeric thresholds enforced in tools.
An approval request needs the action, the reason, the evidence, the risk, the alternatives and a clear choice, and should allow edits.
Approval fatigue is real. Ask only where needed, make decisions easy, plant tests and limit the load.
In the lesson's example, reviewing everything cut a ₹40,000 daily loss to ₹12,000 and a good flagged quarter cut it to ₹9,600, at a quarter of the reviewer time. A weak flag can make it worse.
Staff the review. 200 items at 3 minutes need 1.67 reviewers, or 0.42 with triage.
A good hand-back says what was asked, what was done, where and why it stopped, what is recommended and what the person must do. Log decisions and use them to adjust the tiers.
Check yourself
1. Name the four ways a person can be involved in an agent's work.
Approving before, reviewing after, monitoring and taking over.
2. Which two questions place an action in a risk tier?
How bad is a mistake, and how easily can it be undone.
3. What is approval fatigue and how can you detect it?
Reviewers stop reading and click approve. Warning signs are an approval rate near 100 per cent, decisions that take seconds and few or no rejections. Planted bad requests can test it.
4. With 300 actions a day, 4 minutes per review and 6 focused hours per reviewer, how many reviewers are needed to review everything?
300 × 4 = 1,200 minutes. 6 hours is 360 minutes. 1,200 ÷ 360 = 3.33 reviewers.
5. Why should an approval be tied to the exact parameters of an action?
Otherwise an approval for one action could be reused for a different, larger one. A change in parameters should need a new approval.
6. What should a hand-back contain?
What was asked, what the agent did, where and why it stopped, any recommendation, what the person must decide or do, and what the customer was told.
Try this
Set aside seventy-five minutes.
1. List ten actions your agent could take. Place each in tier 1, 2 or 3 and write the threshold in numbers where size matters.
2. For one tier 3 action, mock up the approval request with all six parts.
3. Estimate the daily actions, the error rate, the cost of an error and the cost of a review. Use the first simulator to compare the three review policies.
4. Use the reviewer simulator to find how many reviewers the design needs.
5. Design a triage flag, and write how you would test how many errors it catches.
6. Write five planted-error tests for your reviewers.
7. Write the hand-back format and the rule for what happens if no one responds.
A good result is a human-in-the-loop plan: tiers, thresholds, approval screens, staffing, tests and hand-back rules. Lesson 6.4 asks the last question of this module: whether you need an agent at all.
Tags: Agentic AI Human in the loop Approvals Agent oversight Risk