Case 16: Provisions when the model and the data disagree
A teaching case on provisioning: the model says 3 per cent default, recent data say 4 per cent. Compare keeping the model, recalibrating and adding an overlay.
Every lender that sets aside money for expected credit losses relies on a model, and every model is built on the past. Most of the time the past is a good guide. The trouble comes when the real defaults begin to run above the model's forecast, quarter after quarter, and nobody can say yet whether this is a blip, a trend or the start of something worse. The finance team wants the provision to be right. The risk team wants it to be safe. The business wants the profit not to be reduced for what may turn out to be noise. This case puts you in the room where the number is chosen. You will practise reading a back-test, converting a model error into rupees, comparing four ways of responding on a scenario table, and weighing the cost of providing too little against the cost of providing too much.
This is a composite case. Amrit Finance, its people and its figures are invented for teaching, built on patterns common among Indian lenders. No real company is described, and no number here should be quoted as a fact about any real firm. The rules on expected credit loss, on management overlays and on how provisions are reviewed by auditors and the regulator are set by the standards and by the regulator and change from time to time, so check the current directions and your auditors' views before using any approach like these.
The decision
Meena Kapoor, the chief risk officer of Amrit Finance, has to bring a proposal to the audit committee on the loan loss provision for the quarter. The book is ₹2,000 crore of unsecured personal loans. The provisioning model says the book's probability of default is 3.0 per cent. The last four quarters of actual defaults average about 4.1 per cent, and the trend is upwards. The model's ranking power has also declined. Meena must say how much to provide, why, and what to do about the model.
Background
How the provision is set. Under an expected-credit-loss approach, the provision for a portfolio is roughly the probability of default times the loss given default times the exposure. For Amrit, the loss given default is 55 per cent and the exposure is the ₹2,000 crore book, so:
provision = PD × 55% × ₹2,000 crore
With the model's PD of 3.0 per cent, the provision is 0.03 × 0.55 × 2,000 = ₹33.0 crore.
What the back-test shows. The risk analytics team compared the model's forecast with what actually happened over the last four quarters.
Quarter · Model PD · Actual default rate1 · 3.0% · 3.4%
2 · 3.0% · 3.8%
3 · 3.0% · 4.3%
4 · 3.0% · 4.8%
The average of the actual rate is about 4.1 per cent, and the latest quarter is 4.8 per cent, which is 1.6 times the model's figure.
Other warning signs. The model's Gini coefficient, a measure of how well it ranks borrowers from risky to safe, has fallen from 0.52 at development to 0.41. The population stability index shows the mix of borrowers has shifted (0.31, above the 0.25 level that usually triggers a review). The new loans of the last year are riskier than the ones the model was built on, because the lender expanded into new cities and into younger borrowers.
What the choice is about. The accounting standard asks for a provision that reflects reasonable and supportable information, including forward-looking information. Auditors will ask why the provision was not raised in line with the data. The business will ask why profit should fall on the basis of a few quarters of data. A model rebuild will take about six months.
The numbers
Exhibit 1: four ways to respond
Meena's team wrote down four options and the provision each would give.
A. Keep the model. PD 3.0 per cent. Provision ₹33.0 crore.
B. Recalibrate. Scale the model's PD by the ratio of actual to predicted defaults, 4.1 ÷ 3.0 = 1.37. PD 4.1 per cent. Provision ₹45.2 crore.
C. Add an overlay to the model. Keep the model's PD and add a management overlay of 0.5 per cent of the book, ₹10 crore. Provision ₹43.0 crore.
D. Recalibrate and add a smaller overlay. Scale the PD by 1.37 and add an overlay of 0.3 per cent of the book, ₹6 crore, to cover the rising trend and the weaker ranking. Provision ₹51.2 crore.
Exhibit 2: what would the loss actually be?
Nobody knows the true PD for the next year. Meena's team defined four scenarios and what the expected loss would be in each (PD × 55% × ₹2,000 crore):
Scenario · PD · Actual expected lossReturns to the model · 3.0% · ₹33.0 crore
Stays at the recent average · 4.1% · ₹45.1 crore
Worsens · 5.0% · ₹55.0 crore
Severe · 6.0% · ₹66.0 crore
The difference between each option's provision and the actual loss (positive means over-provided) is:
Scenario · A · B · C · DReturns to model (3.0%) · 0.0 · +12.2 · +10.0 · +18.2
Stays at 4.1% · −12.1 · +0.1 · −2.1 · +6.1
Worsens (5.0%) · −22.0 · −9.8 · −12.0 · −3.8
Severe (6.0%) · −33.0 · −20.8 · −23.0 · −14.8
### Exhibit 3: weighing the two kinds of error
Providing too little and providing too much are not equally costly. If the provision falls short, the shortfall comes through later as an extra charge, probably at a worse time, when the lender's capital is under pressure and the auditors and regulator are paying attention. The team estimates that a rupee of shortfall costs about 1.5 times as much as the rupee itself. If the provision is too high, the excess is released later, but it has depressed profit in the meantime, and it may signal weakness. The team puts the cost of a rupee of excess at about 0.4 of a rupee.
They assign rough probabilities to the scenarios: 15 per cent that the PD returns to the model, 45 per cent that it stays near 4.1, 25 per cent that it worsens to 5.0 and 15 per cent that it reaches 6.0. The expected weighted cost of each option is then:
Option · Provision · Expected weighted costA. Keep the model · ₹33.0 crore · 23.8
B. Recalibrate · ₹45.2 crore · 9.1
C. Overlay on the model · ₹43.0 crore · 11.7
D. Recalibrate plus overlay · ₹51.2 crore · 6.9
## Questions to consider
1. What does the back-test show, and why is the trend more worrying than the average gap?
2. What do the fall in Gini and the high population stability index tell you that the back-test does not?
3. Why does keeping the model have the highest expected cost? Under which scenario is it the best choice?
4. Explain the weights of 1.5 and 0.4. Do you agree with them? How would a different weight change the choice?
5. Option D provides more than the recent average implies. Is that prudence or over-provisioning? What evidence would change your view?
6. What should Meena do about the model itself, in addition to setting this quarter's provision?
Analysis
Step 1: the model is wrong, and getting worse
A single quarter above the forecast is noise. Four quarters, each above the last, are a pattern. The actual default rate has moved from 3.4 to 4.8 per cent against a flat forecast of 3.0 per cent, so the model underestimated by 13 per cent in the first quarter and by 60 per cent in the fourth. The trend matters more than the average of 4.1 per cent: if it continues, the next quarter will be higher than 4.8 per cent, and a provision based on the average will be too low again.
The other signs back up the back-test. A Gini of 0.41 against 0.52 means the model ranks borrowers less well than it did, so it is less able to tell which loans will default. And a population stability index of 0.31 tells Meena the borrowers have changed since the model was built, so its assumptions about who the lender lends to no longer hold. The model is not only miscalibrated. It is also out of date.
Step 2: in rupees
Each percentage point of PD on this book is worth 0.01 × 0.55 × 2,000 = ₹11 crore. The 1.1-point gap between the model and the recent average is therefore ₹12.1 crore, and the 1.8-point gap to the latest quarter is ₹19.8 crore. A provision of ₹33 crore, which is the model's, would therefore be short by ₹12 to ₹20 crore if the recent data are the truth. This is a large amount for a lender whose quarterly profit may be in the range of ₹40 to ₹60 crore.
Step 3: read the scenario table
The table of gaps tells a clear story.
Keeping the model (A) is exactly right only if the PD returns to 3.0 per cent, which would mean the last four quarters were an aberration. In every other scenario, it falls short, by ₹12 crore, ₹22 crore or ₹33 crore.
Recalibrating (B) is exactly right if the PD stays at 4.1 per cent and short in the two worse scenarios, by ₹9.8 and ₹20.8 crore.
The overlay on the model (C) gives ₹43.0 crore, close to B, but it is not tied to the data and it does not fix the ranking.
Recalibrating with an overlay (D) is above the loss in the first two scenarios by ₹18.2 and ₹6.1 crore and short in the worse two by ₹3.8 and ₹14.8 crore. It is the most conservative.
So the options are really a choice among bets about the future, with the model as the least likely to be right.
Step 4: the cost of being wrong is not symmetrical
The decision depends on the weights. If a shortfall and an excess cost the same, the best provision is the expected loss, about ₹47 crore with the team's probabilities. But a shortfall costs more than an excess, because it arrives late, when the lender is weak, and because it harms credibility with auditors, the regulator and investors. An excess is an overstatement of the cost, released later. That asymmetry pushes the provision above the expected loss, and with the weights of 1.5 and 0.4, the best of the four is D at ₹51.2 crore (weighted cost 6.9) against ₹9.1 for B, ₹11.7 for C and ₹23.8 for A.
Test the assumptions in the simulator. If the weights are equal at 1.0 and 1.0, the expected cost of B is about 7.5 and D about 8.7, because D's excess now counts in full, so B becomes the best. If the probability of the severe scenario is higher, D gets better. The point is that the choice depends on two judgements that can be stated and challenged: how likely each scenario is and how costly each kind of error is. A committee should debate those, not the final number.
Step 5: what each option says to the outside world
A says the lender trusts its model and has nothing to add. With four quarters of data going the wrong way, that looks like a refusal to look.
B says the lender follows its data and is consistent. It is easy to explain and audit.
C says management has a view but has not tied it to evidence. Overlays are legitimate when the model misses something known, such as a new product or a pending event, but a flat percentage can look arbitrary.
D says the lender follows the data and also allows for the trend and the model's weakening. It is the most prudent, and needs a clear reason for the overlay and a plan to remove it once the model is fixed.
Step 6: fix the model
Whatever the provision, the model needs work. The sensible steps are:
Recalibrate now, which is a quick change to the level of the PD, and document it as a temporary measure.
Rebuild or redevelop with data from the last two years, including the new cities and younger borrowers, and test it on a holdout of recent loans.
Segment the book so that the new customers are treated separately until they have a record.
Add early warning signals (as in the Credit Risk Analytics track) so that deterioration shows up in months and not quarters.
Set a review trigger, for example when the actual rate exceeds the model's by more than 20 per cent for two quarters running, so that the next divergence is handled by policy and not by argument.
Plan to remove the overlay when the rebuilt model is validated, and report the release openly.
Step 7: Meena's proposal
Meena proposes option D: recalibrate the model PD by 1.37, add a ₹6 crore overlay (0.3 per cent of the book) that is linked to the rising trend and the weaker ranking, and total ₹51.2 crore. She explains that this is above the recent average loss (₹45.1 crore) because the trend is up and a shortfall costs more than an excess. She commits to a rebuild in six months, a quarterly back-test report to the committee and the release of the overlay when the new model is validated. She also tells the committee what would change her mind: two quarters in which the actual rate returns to 3.5 per cent or below would let her reduce the scaling.
What happened
This part of the case is an illustrative epilogue, not a real outcome.
The audit committee accepted option D, after the auditors reviewed the back-test and the reasoning for the overlay. In the next quarter the actual default rate was 5.1 per cent, and in the one after 5.3 per cent. The provision of ₹51.2 crore proved lower than the loss at 5.2 per cent (₹57 crore), but the shortfall was small and was absorbed in the next quarter's charge without a surprise. The rebuilt model, validated after seven months, had a Gini of 0.50 on the recent loans and a PD for the book of 5.0 per cent. The overlay was released, and the provision was reset on the new model. A competitor that had kept its model unchanged reported an unexpected charge in the following quarter, and the committee noted the difference.
Key takeaways
A model that is flat while actual defaults rise for four quarters has a trend problem, not a noise problem. The actual rate went from 3.4 to 4.8 per cent against a forecast of 3.0 per cent.
Rank and stability measures help diagnose the cause: the Gini fell from 0.52 to 0.41 and the stability index was 0.31.
Convert errors to rupees: on this book each point of PD is ₹11 crore of provision, so a 1.1-point gap is ₹12.1 crore.
Compare options on a scenario table, and weigh the two kinds of error by their real cost. A shortfall costs more than an excess.
With weights of 1.5 and 0.4, recalibrating with a small overlay had the lowest expected cost (6.9), against 9.1 for recalibrating alone and 23.8 for keeping the model.
An overlay should be tied to a stated reason, with a plan to remove it.
Fix the model: recalibrate now, rebuild with recent data, segment new borrowers, add early warnings and set a review trigger.
Try this
Set a provision for a portfolio of your own. Set aside forty-five minutes.
1. Choose a portfolio, real or invented, with a book size, a loss given default and a model PD. Write four quarters of actual default rates, with a trend.
2. Compute the provision from the model, the recent average and the latest quarter. Convert the difference into rupees.
3. Write four options (keep, recalibrate, overlay, recalibrate plus overlay) and compute the provision for each.
4. Define four scenarios for the true PD, give each a probability, and make a table of the gap between each option's provision and the actual loss.
5. Choose weights for a rupee of shortfall and a rupee of excess, and compute the expected weighted cost of each option. Test how the choice changes with the weights, using the simulator pattern.
6. Write a five-sentence proposal: the provision, the reason, what would change your mind, the model fix and when the overlay will be released.
A good result is a back-test table with a trend, a provision for each option, a scenario table, a weighted comparison with stated weights and a plan to fix the model. This completes the credit and lending cases in the Case Library for now.
Tags: Case study Provisioning Expected credit loss Model risk Overlays