Lesson 3.3: Roll rate calculations, step by step
Compute roll rates from two monthly loan snapshots: build the from-to table, read cures and roll-forwards, compare count and balance, and chain them to NPA.
By the end of this lesson you will be able to compute roll rates from two consecutive monthly snapshots of a loan book, from the first merge to the final table. You will build a from-to table of counts, divide it into rates, read the diagonal, the cures and the roll-forwards, compare a count-based roll with a balance-based one, and chain the rates to find the share of today's early-stage loans that will reach non-performing status. You should have read Lesson 1.2, which introduced the monthly snapshot, and Lesson 2.4, which defined the delinquency buckets. The arithmetic is counting and dividing, and every step is shown on one small book that you can rebuild yourself.
Lessons 3.1 and 3.2 measured loss once it had happened. A lender does not want to wait for a charge-off to learn that something is wrong. Long before a loan is lost, it spends months sliding through the buckets, and the speed of that slide is the earliest numerical sign of trouble. A roll rate measures it: of the loans in a given bucket this month, what share are in the next worse bucket next month? This lesson shows how to compute roll rates properly. Lesson 3.4 uses them to forecast.
The idea in one sentence
A roll rate is a transition rate between two month-end buckets:
> Roll rate from bucket A to bucket B = loans (or balance) in A last month that are in B this month ÷ loans (or balance) in A last month
The denominator is always the starting bucket. This makes a roll rate a probability: given that a loan began the month in bucket A, what is the chance it ended in B? That framing is what lets us chain rates together later.
The buckets used here are the same as in Lesson 2.4, with the early categories relabelled as month-sized steps. Think of one bucket as one missed instalment on a monthly loan.
Bucket · Days past due · MeaningCurrent · 0 · Up to date
B1 · 1 to 30 · One instalment behind
B2 · 31 to 60 · Two instalments behind
B3 · 61 to 90 · Three instalments behind
NPA · More than 90 · Non-performing
A loan that pays nothing moves one bucket worse each month. A loan that pays its arrears moves back to current. A loan that pays part of the overdue amount may stay where it is or move back a step. This is why a loan's movement between two dates can go forwards, stay, or go back.
Step 1: take two snapshots
The raw material is two snapshots of the same book one month apart. Each has one row per loan with a loan identifier, a balance and the days past due, as in Lesson 1.2. Call them the opening snapshot (last month-end) and the closing snapshot (this month-end).
Two housekeeping rules matter before any calculation.
Keep the same loans. A roll rate follows loans that existed at the opening date. Loans that were opened during the month are not part of any opening bucket, so they are left out of the denominators. They appear only if you also report a "new loans" line.
Decide what to do with closed loans. Some opening loans will have been repaid in full or closed during the month. Give them their own destination, "Closed", so they are counted rather than lost. If you silently drop them the rates in each row will not add to 100 per cent, and the cure rates will be overstated.
Step 2: assign buckets to both snapshots
Convert days past due to a bucket in each snapshot using the same cut-offs. A loan with 14 days past due is in B1, one with 45 is in B2, one with 95 is in NPA. Use the same rule for both dates, because an inconsistent rule would create movement that is just a change of definition.
Step 3: count the movements
Join the two snapshots on the loan identifier and count the number of loans for every pair of (opening bucket, closing bucket). The result is a from-to table of counts. Here is one for an illustrative book. Each row is a bucket at the opening date and each column a bucket at the closing date.
From \ To · Current · B1 · B2 · B3 · NPA · TotalCurrent · 9,800 · 200 · 0 · 0 · 0 · 10,000
B1 · 250 · 50 · 200 · 0 · 0 · 500
B2 · 30 · 20 · 10 · 140 · 0 · 200
B3 · 15 · 0 · 0 · 15 · 120 · 150
The NPA row is left out because in this lesson NPAs are treated as an end state: they stay NPA. Real lenders also track NPAs that cure or are written off, but that is a separate analysis. The total of each row is the number of loans in that bucket at the start. Check that every row's cells add up to its total. If they do not, loans have been lost in the merge.
Read the table one row at a time. Of the 500 loans that were one instalment behind, 250 paid up and became current, 50 stayed in B1 (they probably paid something but not everything), and 200 missed another instalment and moved to B2. None skipped straight to B3, because in one month a monthly loan can move at most one step.
Step 4: divide each row by its total
Divide every cell by the row total to get percentages. This is the transition matrix for the month.
From \ To · Current · B1 · B2 · B3 · NPACurrent · 98.0% · 2.0% · 0% · 0% · 0%
B1 · 50.0% · 10.0% · 40.0% · 0% · 0%
B2 · 15.0% · 10.0% · 5.0% · 70.0% · 0%
B3 · 10.0% · 0% · 0% · 10.0% · 80.0%
Every row adds to 100 per cent. The workings are mechanical: 200 ÷ 10,000 = 2.0 per cent, 200 ÷ 500 = 40.0 per cent, 140 ÷ 200 = 70.0 per cent, 120 ÷ 150 = 80.0 per cent.
Now read the matrix. There are four kinds of cell.
The diagonal is the share that stayed in the same bucket. For Current, 98.0 per cent is good. For B1, B2 and B3, staying is usually partial payment.
The cure rates are the shares that moved back to Current or to a better bucket: 50 per cent of B1, 15 per cent of B2 and 10 per cent of B3. They fall as the bucket worsens, which is the normal pattern. A borrower who is one instalment behind usually recovers. One who is three behind seldom does.
The roll-forward rates are the cells one step to the right of the diagonal. These are the roll rates: Current to B1 is 2.0 per cent, B1 to B2 is 40.0 per cent, B2 to B3 is 70.0 per cent, and B3 to NPA is 80.0 per cent.
The rest are skips and partial movements, which here are zero.
The roll-forward rates are the headline numbers. They typically rise with each step, from a few per cent from Current to well over half in the later buckets. A borrower who has already missed two instalments is much more likely to miss a third than a current borrower is to miss a first, and the climb of the rates is the signature of a delinquency process.
Predict first: from the table, take 1,000 loans that are in B1 today. If the roll rates stay the same each month, and we count only loans that keep missing instalments every month, how many will reach NPA after three months? Work it out before reading on.
After one month 40 per cent roll to B2, which is 400 loans. Of those 400, 70 per cent roll to B3 the month after, which is 280. Of those 280, 80 per cent roll to NPA in the third month, which is 224. So 224 of the 1,000, or 22.4 per cent, reach NPA in three months by missing every instalment. The multiplication that gave this is 0.40 × 0.70 × 0.80 = 0.224.
This chain is the central trick of roll rate analysis. Because each rate is a probability conditional on the loan being in a bucket, the chance of a whole journey is the product of the steps. It does not count the loans that cure and later slip again, so it is a lower bound on how many of today's B1 loans eventually go bad. It answers a narrower question: what share of B1 will reach NPA in exactly three monthly steps, never stopping on the way.
Lower the B1 roll rate from 40 to 30 per cent and watch the chain fall to 16.8 per cent. A ten-point improvement in the first step cuts the final outcome by a quarter. The earlier a bucket is in the chain, the more leverage a change in its roll rate has, because every later step multiplies it.
Step 5: compute the rate on balances, not just counts
The table above counts loans. A lender cares about money, so the next step repeats the calculation with balances. The method is identical, except each cell holds the opening balance of the loans that moved, summed, rather than the number of loans.
There are two ways to define the balance in a cell, and the choice must be stated.
Opening balance of the loans that moved. Sum the balance each loan had at the opening date. The row total is the opening balance of the bucket. This is the standard method, because it keeps numerator and denominator on the same basis.
Closing balance of the loans that moved. Sum what the same loans owe at the closing date, divided by the opening bucket balance. This mixes two dates, and a repayment during the month lowers the numerator for no reason connected with risk.
Using the first definition, suppose the B1 bucket opened with ₹100 crore, and the loans that moved to B2 had opening balances adding to ₹38 crore. The balance roll rate is 38 ÷ 100 = 38.0 per cent, against the 40.0 per cent count roll. The balance rate is lower because the loans that rolled forward were a little smaller than average. Larger borrowers in this illustrative book get more attention from collections and tend to cure more often.
The opposite can be true: in a book of large corporate loans the biggest borrowers may be the ones that roll. When the count and balance rolls differ, the gap is information. A balance roll above the count roll says the biggest loans are going bad, which is worse for losses than the count suggests, and calls for an immediate look at concentration.
Basis · B1 to B2 · B2 to B3 · B3 to NPABy number of loans · 40.0% · 70.0% · 80.0%
By opening balance · 38.0% · 67.0% · 82.0%
In the illustrative table above the third column reverses the pattern: by the time a loan is three instalments behind, the larger balances are the ones that roll to NPA. A report that shows only counts would hide this.
Step 6: smooth over several months
One month of roll rates is noisy, especially in the later buckets where the denominators are small. B3 here has only 150 loans, so a swing of 15 loans changes the rate by 10 points. Practical teams do three things.
1. Compute the rate every month and plot it as a series, so you see its direction and its level.
2. Use a moving average of three or six months for the planning figure, and keep the latest month as the signal.
3. Report the denominators next to the rates, so a reader knows when a large movement comes from a small base.
The series is where roll rates earn their keep. A rise in the B1 to B2 rate for three consecutive months, with no change in the current to B1 rate, usually means that collections are working less well, or that borrowers who are already stretched are tipping over. Compare two lenders.
Lender Y has a lower rate and a stable one. Lender X is higher and rising by roughly a point a month, which if it continues will lift its final losses long before a headline NPA ratio moves. The NPA ratio of Lesson 2.4 is a lagging measure, because a loan takes three months to reach it. The roll rate from B1 to B2 is available the month after the first missed payment.
Building the table in Python
The whole procedure is a merge, a bucket assignment and a cross-tabulation.
python
import pandas as pd
a = pd.readcsv("snap202609.csv") # opening: loanid, balance, dpd
b = pd.readcsv("snap202610.csv") # closing: loanid, balance, dpd
bins = [-1, 0, 30, 60, 90, 100000]
labels = ["Current", "B1", "B2", "B3", "NPA"]
a["bucket"] = pd.cut(a["dpd"], bins, labels=labels).astype(str)
b["bucket"] = pd.cut(b["dpd"], bins, labels=labels).astype(str)
left join keeps loans that closed; they get the label "Closed"
m = a.merge(b[["loanid", "bucket"]], on="loanid", how="left", suffixes=("open", "close"))
m["bucketclose"] = m["bucketclose"].fillna("Closed")
counts
counts = pd.crosstab(m["bucketopen"], m["bucketclose"])
ratescount = counts.div(counts.sum(axis=1), axis=0) 100
balances, on the opening balance of each loan
bal = pd.crosstab(m["bucketopen"], m["bucketclose"],
values=m["balance"], aggfunc="sum").fillna(0)
ratesbal = bal.div(bal.sum(axis=1), axis=0) 100
order = ["Current", "B1", "B2", "B3", "NPA"]
print(ratescount.reindex(order).round(1))
print(ratesbal.reindex(order).round(1))
Three checks should follow every run. The row totals must equal the number of loans (or the balance) in each opening bucket. The rows of each rate table must add to 100. And the loans in the closing snapshot that are not in the opening one, the new loans, should be reported separately rather than forced into the table.
A worked example: finding the weak link
A lender computes its monthly transition matrix and finds that the B2 to B3 roll rate has risen from 60 to 70 per cent over four months, while every other rate is flat. How should it read this?
1. Which bucket is the problem? Only the B2 step has changed. Borrowers are paying as before in Current and B1, and the NPA step is unchanged. So the issue lies in the process that handles borrowers who are 31 to 60 days late.
2. What happens in that bucket? For many lenders this is where the collections process hands the account from the in-house tele-calling team to field agents, or where a legal notice is sent. A change in staffing, in the agency, or in the capacity of the team can lift the roll rate.
3. Is it the mix? Split the roll rate by product, region and channel. If the rise sits in one region, or one product that was recently launched in large volume, it is a portfolio issue, not a collections issue.
4. How big is it in money? A ten-point rise in the roll rate on a B2 bucket of ₹60 crore is ₹6 crore more heading to B3 each month. Applying the B3 to NPA rate of 80 per cent, that is about ₹4.8 crore of extra slippage a month, and applying an LGD of 60 per cent, about ₹2.9 crore of extra loss a month.
The final step, converting a roll rate change into a rupee change, is the bridge to Lesson 3.4. A change that looks small in percentage terms can be material in rupees, and the transition matrix is the tool for seeing it a quarter before it shows up in charge-offs.
Reading a roll rate: five traps
Small denominators. A rate based on 40 loans can jump 10 points on four loans. Report the count beside the rate.
Different definitions of the bucket. Some lenders use calendar buckets by missed instalment count, others use days past due. A loan with two missed instalments and 40 days past due sits in different places under different rules. Fix the definition once.
Cumulative against sequential buckets. Some teams measure the roll from "30 plus" to "60 plus", where each bucket includes everything worse. The numbers differ from the sequential rates in this lesson, so never compare rates from two teams without checking which is used.
Mixing the cured and the stayed. A rising diagonal in the delinquent buckets can mean borrowers are making partial payments, which is mildly good, or that collections are failing to collect and loans are simply stuck, which is not. Look at the cure rate beside it.
Seasonality and calendar effects. Monthly instalments that fall on a weekend or a holiday, or salaries that arrive late in a month, can push loans across a bucket boundary for a few days without any change in credit quality. Compare the same month a year earlier before drawing a conclusion.
Common mistakes
Dropping closed loans. Rows will not add up, and cure rates look better than they are.
Dividing by the wrong total. The denominator is the opening bucket, not the closing bucket.
Using closing balances in the numerator. Repayments in the month distort the rate. Use opening balances.
Reading one month as a trend. Smooth over several months and show the denominators.
Comparing lenders with different bucket rules. Check calendar against days-past-due and cumulative against sequential definitions.
Treating the chain as the whole story. Multiplying roll rates ignores cures and re-defaults, so it is a lower bound on eventual deterioration.
Forgetting new loans. They are not part of any opening bucket and need a separate line.
Ignoring the balance basis. Count rolls can hide the fact that large exposures are the ones moving.
Key takeaways
A roll rate is the share of loans or balance in a starting bucket that sit in the next worse bucket one month later. The denominator is always the opening bucket.
Build it in four moves: two snapshots, the same bucket rules on both, a from-to table of counts, then each row divided by its total.
The roll-forward rates climb with each bucket. In the illustrative book they were 2, 40, 70 and 80 per cent, and cure rates fell the other way.
Chained roll rates give the share of a bucket that reaches NPA by missing every instalment: 0.40 × 0.70 × 0.80 is 22.4 per cent from B1.
Compute rolls on balances as well as counts. When the two differ, the gap says whether big or small loans are going bad.
Roll rates lead the NPA ratio by months. Plot them monthly, smooth them, and read direction before level.
Check yourself
1. In a bucket of 400 loans, 120 moved to the next worse bucket, 200 became current and 80 stayed put. What is the roll rate, the cure rate and the stay rate?
Roll 120 ÷ 400 = 30 per cent. Cure 200 ÷ 400 = 50 per cent. Stay 80 ÷ 400 = 20 per cent, and the three add to 100.
2. Roll rates are 3 per cent from Current to B1, 45 per cent from B1 to B2, 65 per cent from B2 to B3 and 75 per cent from B3 to NPA. What share of B1 loans reach NPA in three months by missing every instalment?
0.45 × 0.65 × 0.75 = 0.2194, so 21.9 per cent.
3. Why must closed loans be given a destination in the from-to table?
Otherwise the rows do not add to the opening total and the cure rates are overstated, because loans that left the book look like loans that vanished from the denominator.
4. The B2 bucket opens with ₹80 crore, and loans with opening balances adding to ₹52 crore are in B3 a month later. What is the balance roll rate, and what would you do if the count roll rate were 55 per cent?
52 ÷ 80 = 65 per cent. A balance roll of 65 per cent against a count roll of 55 means the larger loans are the ones rolling, so check concentration and the largest accounts first.
5. Why does a rise in the B1 to B2 roll rate matter more for future losses than a rise in the B3 to NPA rate of the same size?
Because the effect multiplies through every later step in the chain, and because it appears earlier, giving more time to act. The B3 rate is already close to the end.
Try this
Build a transition matrix from two snapshots of your own. Set aside forty to forty-five minutes.
1. Invent or download two snapshots of at least 200 loans one month apart, each with a loan identifier, a balance and days past due. Make about 10 per cent of loans delinquent, and let a few loans close during the month.
2. Assign the five buckets in both snapshots using the same cut-offs.
3. Join the snapshots on the loan identifier, keeping closed loans with the label "Closed".
4. Build the from-to table of counts and check that each row adds up to the opening bucket size.
5. Divide each row by its total and read the matrix: the diagonal, the cure rates and the roll-forward rates.
6. Repeat the table on opening balances. Compare each roll rate on the two bases and write down where they differ.
7. Chain the three delinquent roll rates and compute the share of B1 that reaches NPA in three months. Use the simulator to see what a five-point change to each rate does.
8. Write four sentences for a collections head: which step worries you most, what the count and balance rolls say, what the chain implies and what you would check next.
A good result is a from-to table whose rows add up, a transition matrix you can read aloud, and a chained figure that you can explain in one line. With the matrix in hand, Lesson 3.4 uses it to forecast how many rupees will reach NPA over the next months and what they will cost.
Tags: Credit Risk Analytics Roll Rates Delinquency Collections Transition Matrix