Lesson 3.4: Roll rate analysis, forecasting losses from flows
Use roll rates to forecast how many rupees will reach NPA over the coming months, turn the flow into expected loss with LGD, and stress the rates.
By the end of this lesson you will be able to turn a set of roll rates and today's bucket balances into a month-by-month forecast of the money that will reach non-performing status, convert that flow into an expected loss with a loss given default, and test how the forecast changes when the roll rates worsen. You will also be able to say how far to trust such a forecast, what it leaves out, and how to check it against what actually happens. You should have read Lesson 3.3, which built the roll rates, and Lesson 3.1, which gave the loss given default of a defaulted loan. The arithmetic is multiplication and addition, and the whole forecast is worked out by hand on one small book before you meet the code.
Lesson 3.3 produced a transition matrix. A matrix is a description of the past month. This lesson uses it as a machine for the future. The idea is simple. If you know how much money is in each bucket today, and you know the share that moves forward each month, you can pass the money along the buckets month by month and see when and how much arrives at the NPA door. That flow, times the loss on each rupee, is a forecast of credit losses that does not wait for the accounting to catch up.
The pipeline picture
Think of the delinquency buckets as a pipeline with four tanks in a row: Current, B1, B2 and B3, and an outlet at the end called NPA. Money does not flow through all at once. Each month a share of every tank moves to the next tank, the rest drains back to Current as cures, and the last tank empties into NPA.
Two consequences follow, and they organise everything in this lesson.
1. Losses are lagged. A rupee that is in Current today needs about four months to reach NPA, if it ever does. So the NPA inflow in the next three months is already decided by what is sitting in B1, B2 and B3 now, and only slightly by new lending or new borrower stress. That makes the near-term forecast quite reliable.
2. The far future depends on the inflow from Current. After about four months the NPA flow is set by how many new loans enter B1, which is the Current to B1 roll rate times the current balance. This is where the forecast becomes uncertain, because it depends on future borrower behaviour.
The inputs
Take a different illustrative lender from the earlier lessons, with a book of ₹5,100 crore at a month-end.
Bucket · Balance (₹ crore)Current · 4,800
B1 · 100
B2 · 50
B3 · 30
NPA · 120
Total · 5,100
The roll rates are the sequential ones from the transition matrix of Lesson 3.3, taken on balances.
Current to B1: 2.0 per cent
B1 to B2: 40 per cent
B2 to B3: 70 per cent
B3 to NPA: 80 per cent
The loss given default, from the cohort analysis of Lesson 3.1, is 55 per cent of the balance that reaches NPA. Treat the balance in each bucket as fixed over the forecast, which means we ignore amortisation, fresh lending and growth in Current. These simplifications are not realistic, and later we examine their effect, but they let us see the mechanism clearly.
Step 1: the first three months, from the stock already in the pipe
Month 1. Only the money in B3 can reach NPA in one month, because it needs just one roll. The inflow is 80 per cent of ₹30 crore = ₹24.0 crore. At the same time, the other tanks move forward: B2 sends 70 per cent of ₹50 crore, which is ₹35 crore, into B3; B1 sends 40 per cent of ₹100 crore, which is ₹40 crore, into B2; and Current sends 2 per cent of ₹4,800 crore, which is ₹96 crore, into B1.
Month 2. The money now in B3 is the ₹35 crore that just arrived. It rolls to NPA at 80 per cent: 0.80 × 35 = ₹28.0 crore. B2 now holds ₹40 crore (from B1), and it sends 70 per cent, ₹28 crore, into B3. B1 holds ₹96 crore, and sends 40 per cent, ₹38.4 crore, into B2.
Month 3. B3 holds the ₹28 crore that arrived. NPA inflow: 0.80 × 28 = ₹22.4 crore. B2 holds ₹38.4 crore and sends 70 per cent, ₹26.88 crore, into B3.
Month 4. B3 holds ₹26.88 crore, and the inflow is 0.80 × 26.88 = ₹21.5 crore (21.504). From now on, all that feeds the pipe is the steady ₹96 crore a month entering B1 from Current, so the pattern settles at 0.80 × 0.70 × 0.40 × 96 = ₹21.5 crore a month.
Put the whole forecast in one table. Each column is the balance at the end of the month in the bucket, and the last column is the inflow into NPA during the month.
Month · B1 · B2 · B3 · Inflow to NPANow · 100.0 · 50.0 · 30.0 ·
1 · 96.0 · 40.0 · 35.0 · 24.0
2 · 96.0 · 38.4 · 28.0 · 28.0
3 · 96.0 · 38.4 · 26.9 · 22.4
4 · 96.0 · 38.4 · 26.9 · 21.5
The B1, B2 and B3 columns show balances after the roll, with the cure share having drained back to Current. Check one cell: B2 in month 1 is 40 because 40 per cent of the ₹100 crore in B1 rolled forward. Check another: B3 in month 3 is 26.88 because 70 per cent of the ₹38.4 crore in B2 rolled forward. The inflow column follows from the previous month's B3: each is 80 per cent of it.
The first three months add to 24.0 + 28.0 + 22.4 = ₹74.4 crore of expected new NPAs. Over twelve months, add nine more months at ₹21.504 crore: 74.4 + 193.5 = ₹267.9 crore.
Predict first: if the B1 to B2 roll rate rose from 40 to 50 per cent and every other rate stayed the same, what would the steady monthly inflow to NPA become? Think before reading on.
Each rupee entering B1 now has a 50 per cent chance of rolling, up from 40 per cent, so the whole stream of inflow grows in proportion: 0.80 × 0.70 × 0.50 × 96 = ₹26.9 crore a month, up from ₹21.5 crore. That is 25 per cent higher from a ten-point change in a single rate, because 50 divided by 40 is 1.25. In the steady state, the inflow is proportional to each roll rate in the chain, so a given percentage rise in any one of them has the same percentage effect on losses.
Step 2: from the inflow to a loss
The inflow to NPA is the balance that has defaulted, which is the exposure at default. Multiply it by the loss given default to get the expected loss on that flow.
Next three months: 74.4 × 0.55 = ₹40.9 crore of expected net loss.
Next twelve months: 267.9 × 0.55 = ₹147.4 crore.
Relate that to the whole book. The twelve-month loss of ₹147.4 crore, divided by the opening standard book of ₹4,980 crore (4,800 + 100 + 50 + 30), is a loss rate of 2.96 per cent, and this is a forecast of the credit cost that lenders and analysts compare with the budget. Notice how it breaks down: the money already in B1, B2 and B3 produces the ₹74.4 crore of the first quarter's inflow, which is 28 per cent of the twelve-month total of ₹267.9 crore, and the rest comes from the new stream entering from Current.
One more link to earlier lessons. The existing NPA stock of ₹120 crore is not in this forecast at all. Its loss is already built into provisions and the recoveries on it are a separate analysis, the recoveries on charged-off loans of Lesson 3.2. Roll rate forecasting looks at flows into NPA only, which is why it is a tool for the next quarter's credit cost and not for the whole balance sheet.
Step 3: try your own numbers
The simulator below applies the same arithmetic. It keeps the first four months explicit, so you can see where each rupee of inflow comes from.
Move the B1 roll rate from 40 to 50 per cent and the steady inflow rises to 26.9. Move the loss given default from 55 to 70 per cent and the loss rate rises by more than a quarter without any change in how many loans default. These are the two levers of expected loss that Lesson 1.1 named, now with a flow behind them.
Step 4: stress the roll rates
Lenders do not only forecast the central case. They ask what happens if the rolls worsen, as they would in a recession or after a shock to borrowers' income. A roll-rate stress is easy to run, since it needs only different rates.
Suppose a stress case where every roll rate increases: Current to B1 at 2.5 per cent, B1 to B2 at 50 per cent, B2 to B3 at 80 per cent and B3 to NPA at 90 per cent. The stock in the buckets today is the same. Compute the monthly inflow.
Month 1: 0.90 × 30 = 27.0
Month 2: 0.90 × 0.80 × 50 = 36.0
Month 3: 0.90 × 0.80 × 0.50 × 100 = 36.0
Month 4 onward: B1 entering each month is 0.025 × 4,800 = 120, so inflow is 0.90 × 0.80 × 0.50 × 120 = 43.2
The three-month inflow in the stress case is 27.0 + 36.0 + 36.0 = ₹99.0 crore against ₹74.4 crore in the base case, a rise of 33 per cent. By month four the monthly inflow has doubled, from 21.5 to 43.2, because four rates all moved at once and the effects multiply: 1.25 × 1.25 × 1.14 × 1.125 is about 2.0. The shape of the difference is as important as its size. In the first month, the stress barely shows (27.0 against 24.0), because the money about to default is already past the point where rates can change much. The damage appears with a lag, which is why waiting for charge-offs is too late and why an early stress test is useful.
The stress also helps to size the response. If the lender's budget allowed for a credit cost of 3 per cent, the stress case at the same 55 per cent LGD would give a twelve-month inflow of 99.0 + 9 × 43.2 = ₹487.8 crore and a loss of 0.55 × 487.8 = ₹268.3 crore, or 5.4 per cent of the standard book, about two points above the budget. That gap is the sum the lender must be ready to cover in provisions and capital in a bad year.
Where the forecast comes from, and where it breaks
A forecast built on roll rates is only as good as its assumptions, and an analyst should state them. Here are the main ones, with what to do about each.
Stable roll rates. The forecast assumes that rates stay where they were. They do not. Seasonal effects, changes in collections and shifts in borrower quality all move them. Mitigate by using a 3-month or 6-month average, by checking the same month last year, and by running the stress above.
Fixed balances. The model holds each bucket at today's balance. In truth balances fall as loans amortise and rise as new loans are made, which dilutes or enlarges the flow. A refinement lets Current grow with lending and shrink with repayments.
Cures drain to Current. Our simple model sends everything that does not roll forward back to Current. In reality some stay in the bucket, some move back one step, and some cured loans slip again. The full transition matrix handles this, and the code below shows how.
One loss given default for all. A single LGD of 55 per cent ignores the differences between products and between delinquency stages. Late-stage loans tend to recover less. Use LGD by segment where the data allows.
No change in mix. If the book is rebalanced towards a riskier segment, the blended roll rates no longer apply. Forecast by segment and add up.
Policy actions. Moratoria, restructuring and regulatory forbearance can pause the roll without improving credit quality. A stable roll rate during a moratorium says nothing about risk, so adjust or exclude such periods.
None of these makes the method useless. They define what questions it answers well: the next quarter's NPA inflow, given what is already late, and the sensitivity of that inflow to the collections process. For longer horizons and for the true shape of losses over a loan's life, the migration and vintage methods of Module 4 take over.
Doing it with the full matrix in Python
A fuller version uses the whole transition matrix, including stays and cures, and repeats it month by month. Multiplying a vector of today's balances by the matrix gives next month's balances, and doing it again gives the month after.
python
import numpy as np
buckets = ["Current", "B1", "B2", "B3", "NPA"]
rows = from, columns = to, each row sums to 1 (NPA is absorbing)
P = np.array([
[0.980, 0.020, 0.000, 0.000, 0.000],
[0.500, 0.100, 0.400, 0.000, 0.000],
[0.150, 0.100, 0.050, 0.700, 0.000],
[0.100, 0.000, 0.000, 0.100, 0.800],
[0.000, 0.000, 0.000, 0.000, 1.000],
])
state = np.array([4800, 100, 50, 30, 120], dtype=float) # Rs crore today
lgd = 0.55
npaprev = state[-1]
totalinflow = 0.0
for month in range(1, 13):
state = state @ P # move the balances one month forward
inflow = state[-1] - npaprev # new NPA created this month
npaprev = state[-1]
totalinflow += inflow
print(f"Month {month:2d} inflow {inflow:6.1f} NPA stock {state[-1]:7.1f}")
print("12-month inflow", round(totalinflow, 1), "expected loss", round(totalinflow lgd, 1))
Because the matrix lets balances stay and move back, the numbers differ from the hand calculation. Run on the matrix above, the first month is the same ₹24.0 crore, but the twelve-month inflow comes to about ₹338 crore against ₹267.9 crore for the forward-only version, and an expected loss of about ₹186 crore against ₹147 crore. The difference arises because cured money returns to Current and B1, and can roll again, and because loans that stay in a bucket roll later instead of vanishing from the pipe. Compare the two outputs on your own book, and treat the gap as a measure of how much cure-and-return behaviour matters. Here the simple chain understates the twelve-month risk by about a fifth, so the forward-only forecast is best used for the next three months, where the two are close, and the full matrix for longer horizons.
The loop above multiplies a row vector by the matrix, which is exactly the pipeline picture in code. To forecast by segment, run the loop once for each segment with its own matrix and starting balances, and sum the inflows.
A worked example: checking the forecast against what happened
A forecast earns trust only by being tested. Suppose the lender made the base-case forecast above three months ago. Now the actual figures are in.
Month · Forecast inflow (₹ crore) · Actual inflow (₹ crore) · Difference1 · 24.0 · 25.5 · +1.5
2 · 28.0 · 31.0 · +3.0
3 · 22.4 · 27.0 · +4.6
Total · 74.4 · 83.5 · +9.1
The actual inflow is ₹9.1 crore, or 12 per cent, above the forecast. The diagnosis follows the same order as the pipeline.
1. Month 1 is close (+1.5), as expected. It depended only on the B3 stock and the B3 roll rate. A small miss means the B3 rate was a little higher than 80 per cent, around 85 per cent.
2. Month 2 is further off (+3.0), driven by B2 and the B2 to B3 rate. If the B2 rate was 75 per cent and not 70 per cent, month 2 would be about 0.85 × 0.75 × 50 = 31.9, close to the actual.
3. Month 3 is the furthest (+4.6), and it depends on three rates at once, including the B1 roll. The widening gap is the pattern of a rate drift that compounds.
4. Conclusion. The actual rates moved up by about 5 points in the late buckets and probably 3 points in B1. Update the rates with the new data, run the stress case with the observed drift, and tell the credit head the forecast for the next quarter rises by about the percentage seen here.
The error grows with each month ahead, which is a property of any chain. It also gives the method a built-in alarm: a persistent miss in the same direction is a signal that the rates are changing, and it appears before the NPA ratio reports it.
Common mistakes
Holding the rates fixed when conditions are changing. Update them every month and show the trend.
Forecasting beyond the horizon the stock supports. The first three months come from existing balances. After that the forecast depends on assumptions about future inflow.
Applying one LGD to every stage and product. Use segment and stage LGDs when available.
Forgetting the NPA stock already on the books. Roll rate forecasts add the new inflow only. The existing stock has its own provisions and recoveries.
Treating a cure as permanent. Loans that return to Current can slip again. Use the full matrix to see it.
Reading a quiet roll rate during a moratorium as good news. Policy, not behaviour, may be holding the rate.
Reporting a single forecast. Give a base case and at least one stress, and say what each assumes.
Never back-testing. Compare the forecast with the actual inflow every month and learn from the gap.
Key takeaways
Roll rates plus today's bucket balances forecast the money reaching NPA. The first three months come from the stock already in B1, B2 and B3, and later months depend on the flow from Current.
In the example the base case gave ₹74.4 crore of NPA inflow in three months and ₹267.9 crore in twelve, an expected loss of ₹147.4 crore at a 55 per cent LGD.
In steady state the inflow is proportional to every roll rate in the chain, so a ten-point rise in B1 to B2 from 40 to 50 per cent lifted the inflow by 25 per cent.
A stress case that raises all the rates doubled the steady inflow, and the damage showed up with a lag, so waiting for charge-offs is too late.
The forecast assumes stable rates, fixed balances, one LGD and no policy interference. State these and test them.
Back-test every month. A persistent miss in one direction means the roll rates are drifting, which is the earliest warning the method gives.
Check yourself
1. B3 holds ₹40 crore and the B3 to NPA roll rate is 75 per cent. What is next month's expected inflow to NPA?
0.75 × 40 = ₹30 crore.
2. B2 holds ₹60 crore. The B2 to B3 rate is 70 per cent and B3 to NPA is 80 per cent. How much of the B2 money reaches NPA two months from now?
60 × 0.70 × 0.80 = ₹33.6 crore.
3. Steady monthly inflow is ₹20 crore, the LGD is 60 per cent and the standard book is ₹4,000 crore. What is the annual expected loss rate?
Annual inflow 240, loss 144, rate 144 ÷ 4,000 = 3.6 per cent.
4. Why is the near-term forecast more reliable than the forecast for month six?
The first three months are determined by money already in B1, B2 and B3. Month six depends on how much new money enters B1, which depends on future borrower behaviour.
5. A lender's roll rates look stable during a six-month loan moratorium. Is that good news for credit quality?
Not necessarily. The moratorium pauses the roll by policy, so the stability says little about risk, and the rates may jump when it ends.
Try this
Forecast the NPA inflow for a book of your own and test it. Set aside forty to forty-five minutes.
1. Take the transition matrix and bucket balances you built in Lesson 3.3, or invent a book with a Current balance, three delinquent buckets and a set of roll rates.
2. Using only forward rolls, work out the inflow to NPA in months 1, 2 and 3 by hand, and the steady inflow from month four.
3. Add the loss given default from your own cohort or an assumed 50 to 60 per cent. Compute the three-month and twelve-month expected loss.
4. Put the same inputs into the simulator and check that your answers match. Then raise the B1 to B2 roll rate by ten points and write down the change in the steady inflow.
5. Build a stress case by raising each roll rate by about ten per cent of its level. Compute the inflow path and compare it with the base case on one chart.
6. Run the full-matrix loop in Python and compare its twelve-month inflow with your forward-only figure. Note the gap and what it tells you about cures.
7. Pretend three months have passed and make up the actual inflows, 10 per cent above the forecast. Diagnose which rates probably moved, and write a four-sentence note to a credit head with a revised forecast.
A good result is a month-by-month table that you can rebuild, a base and a stress case on the same chart, and a note that states the assumptions behind the numbers. With roll rates in hand, Module 4 moves to two methods that cover their gaps. Credit migration matrices follow loans across all grades over longer horizons, and vintage analysis follows each year's lending as it ages, which is the cleaner way to see the true cost of a growing book.
Tags: Credit Risk Analytics Roll Rates Loss Forecasting Delinquency Flows Stress