Case 68: Two junior hires or one senior?
A teaching case on staffing a small team: two juniors or one senior. Compare output per rupee over three years with ramp-up, supervision and senior-only work.
A manager with one open position and a fixed budget often faces the same offer from two directions. An experienced candidate costs ₹28 lakh a year. For roughly the same money the manager could hire two people early in their careers at ₹10 lakh each. Two people can plainly do more than one. But the arithmetic of "two for the price of one" leaves out the things that make hiring hard: how long a new person takes to become useful, how much of the manager's time they need, and above all what share of the work only an experienced person can do. This case works through the numbers for a design team. You will practise comparing options by output per rupee, including the ramp-up and the supervision cost, finding the share of work that only a senior can do at which the answer flips, and thinking about the choices that fall between the two options.
This is a composite case. Aditi Rao, her team and the figures are invented for teaching, and the productivity numbers are illustrative assumptions, not a measure of what people at any level can do. Real hiring depends on the individuals, and no model can replace a good interview process.
The decision
Aditi Rao, head of a ten-person product design team at a software company, has permission to hire for one opening and a budget of about ₹28 lakh a year in salary. She can hire one senior designer at ₹28 lakh, or two junior designers at ₹10 lakh each (₹20 lakh in total, with some budget left over). Her manager favours the juniors: "two people is more capacity, and we can develop them". Her most experienced designer says the team is already stretched, and that juniors will take his time. Aditi has to decide, and she wants to see how the numbers look over three years.
Background
The work. The team has about 1.2 units of work a month to hand to the new hire or hires, where a unit is the output of one fully effective senior designer in a month. Some of the work is routine: screens, components, variations and updates to existing designs. Some is senior-only: defining a new product's structure, leading research, making difficult decisions with engineers and setting direction. The share of the work that is senior-only is a number Aditi is not sure of, and which turns out to matter most. Call it s.
What a senior can do. A senior designer can do all the work, routine and senior-only, but only 1.0 unit a month, and takes two months to reach full output (the first month at half).
What a junior can do. A junior designer, once up to speed, produces about 0.6 units a month of routine work, and cannot do the senior-only work. A junior takes six months to reach that level, growing steadily (a sixth of the way a month). Two juniors therefore produce at most 1.2 units a month of routine work, but no more than the routine work that exists: (1 − s) × 1.2.
What it costs.
A senior costs ₹28 lakh a year.
A junior costs ₹10 lakh a year, so two juniors cost ₹20 lakh.
Juniors need supervision: reviewing work, giving feedback and teaching. Aditi estimates this costs about ₹6 lakh a year of a senior's time for two juniors. So two juniors cost ₹26 lakh a year including supervision. A new senior needs little supervision.
The numbers
Exhibit 1: steady output per rupee
Once everyone is up to speed (ignoring the ramp), the monthly output and the cost per year are:
Senior: 1.0 unit a month, ₹28 lakh a year: 0.0357 units a month per lakh.
Two juniors: the smaller of 1.2 and (1 − s) × 1.2 (that is, (1 − s) × 1.2 since the work available caps it), at a cost of ₹26 lakh.
Share of work that is senior-only (s) · Two juniors' output a month · Per lakh of cost · Senior per lakh · Better10% · 1.08 · 0.0415 · 0.0357 · Juniors
20% · 0.96 · 0.0369 · 0.0357 · Juniors, narrowly
30% · 0.84 · 0.0323 · 0.0357 · Senior
50% · 0.60 · 0.0231 · 0.0357 · Senior
In steady state, the juniors win only if less than about 23 per cent of the work is senior-only. Without counting supervision (cost ₹20 lakh), the break-even would be 40 per cent. The supervision cost moves it from 40 to 23 per cent.
Exhibit 2: the first three years, with ramp-up
Real output starts below the steady state. Over 36 months, using the ramp-up described, the cumulative output and the cost per unit are:
Share senior-only (s) · Juniors: 36-month output · Per lakh (cost ₹78 lakh) · Senior: 36-month output · Per lakh (cost ₹84 lakh) · Better10% · 36.5 · 0.468 · 35.5 · 0.423 · Juniors
20% · 32.7 · 0.419 · 35.5 · 0.423 · About equal
30% · 28.9 · 0.370 · 35.5 · 0.423 · Senior
50% · 21.0 · 0.269 · 35.5 · 0.423 · Senior
Over three years the break-even share is about 20 per cent. Above that, the senior is cheaper per unit of output. The senior's output over 36 months is 35.5 units (a half in month 1 and a full unit for each of the other 35). The two juniors' output is limited by both their ramp-up and the amount of routine work.
Exhibit 3: what the first year looks like
In the first year the senior's advantage is larger, because juniors are still ramping up. At s = 30 per cent:
Month · 1 · 2 · 3 · 4 · 5 · 6 · 7 to 12 · Year 1Two juniors · 0.20 · 0.40 · 0.60 · 0.80 · 0.84 · 0.84 · 0.84 each · 8.72
One senior · 0.50 · 1.00 · 1.00 · 1.00 · 1.00 · 1.00 · 1.00 each · 11.50
The senior produces about 32 per cent more in the first year, at about the same cost (₹28 lakh against ₹26 lakh). If the team needs help urgently, a senior delivers sooner.
Questions to consider
1. Why does the break-even share of senior-only work fall from 40 to 23 per cent when supervision is counted? What other hidden costs might there be?
2. Why do juniors' outputs level off even though they could produce 1.2 units a month?
3. What would make the share of senior-only work larger or smaller in Aditi's team? How could she find out?
4. How does the three-year view differ from the steady state? Which is the right horizon for her decision?
5. What does the model leave out about juniors: their growth, their cost to the team, their loyalty? And about seniors: their cost to hire, their pay expectations, their risk of leaving?
6. What would you recommend to Aditi, and are there choices between the two options?
Analysis
Step 1: the question is about the work, not the people
The decision turns on a number that has nothing to do with the candidates: how much of the work only a senior can do. If most of it is routine, two juniors can do more than one senior, because routine work scales with people. If a large part is senior-only, juniors can do none of it, and extra capacity for the routine part has no value once it is used up.
The table shows how sharply this matters. At 10 per cent senior-only, two juniors produce 1.08 units a month against the senior's 1.0. At 50 per cent, they produce 0.60. The same two people, hired for the same money, produce nearly twice as much in the first case as in the second.
So Aditi's first task is to measure the work: list what the team did over the last six months and tag each piece as one that a junior could do with guidance or one that required a senior's judgement. Her intuition of how much is senior-only may be wrong, in either direction. A manager who has been doing the senior-only work herself may not notice how much of it there is.
Step 2: the hidden cost of supervision
The ₹6 lakh for supervision is an estimate, but the principle is firm: a junior's output is not free. Reviewing a junior's work, giving feedback and answering questions takes someone else's time, and that someone is usually the person whose time is already scarce. Without it, juniors' work needs more rework and their growth slows. The experienced designer's worry is well founded.
If the supervision cost is twice as large (₹12 lakh), the juniors' cost is ₹32 lakh, and the break-even share of senior-only work falls to about 5 per cent. If there is no supervision at all, it is 40 per cent. The decision is more sensitive to the supervision cost than to many of the other numbers.
Other hidden costs of juniors: more time spent on interviewing and onboarding two people, higher rework, more management overhead, and some risk that a junior leaves just when they become productive. For the senior: a higher cost of hiring (agency fees, a longer search), a risk that the person is not as good as the CV, and the risk that a senior who is the sole holder of knowledge leaves.
Step 3: ramp-up matters for the horizon
In the first year, two juniors produce 8.72 units against the senior's 11.5, a gap of 32 per cent in favour of the senior. By the second and third years, the juniors have reached steady state, and the gap narrows or reverses, depending on s. Over three years, with s = 20 per cent, the two options are about equal in output per rupee.
The right horizon depends on the team's situation. If a product launch in six months depends on this hire, the ramp-up matters more than the steady state, and the senior looks better. If the team is building for the long run and expects the juniors to grow, the three-year view is more relevant, and one more consideration applies: juniors grow. The model holds a junior's output constant at 0.6, but a good junior may be at 0.8 in year two and 1.0 in year three, and may take on some of the senior-only work. Over five years, a team of two developed juniors could be worth more than a single senior. That is a real argument for hiring juniors, and the case does not capture it.
Step 4: other options between the two
The case presents a choice between two hires, but there are options between them.
One mid-level hire. A designer with three to four years' experience, at about ₹16 to ₹18 lakh, may do 0.8 units of work and some of the senior-only tasks, with little supervision. In many teams this is the best value.
One senior and one junior. If the budget can stretch, a senior who also mentors a junior combines capacity and growth, and the mentoring becomes part of the senior's job and a retention feature.
A senior on contract. A senior freelancer for the senior-only work, say 30 days a year at ₹25,000 a day (₹7.5 lakh), with a junior hired for the routine work.
One junior now and a senior later. Hire a junior to take the routine work and reduce load, and decide on a senior when the picture is clearer.
Promote from within. Someone already on the team may be ready for the senior-only work, and the hire can be a junior to take their routine tasks.
Each of these changes the numbers. A mid-level hire at ₹17 lakh with 0.8 units a month and 50 per cent of the senior-only work covered would give 0.8 units for ₹17 lakh, or 0.047 per lakh, more than either of the two options at s = 30 per cent.
Step 5: what the model leaves out
Quality. Output measured in units treats a unit of junior work and a unit of senior work as equal. In practice, a senior's work may need fewer iterations and may be better, and a poor decision on structure costs far more than a slow screen.
Growth and retention. A team that develops juniors builds loyalty and a pipeline of people who know the product. A team of seniors may have higher turnover as they move for pay.
Diversity of thinking. A mix of experience levels often produces better results than a team of one level.
Pay compression and fairness. Hiring a very senior person at ₹28 lakh when others are paid less can create tension. Hiring two juniors may mean more entries to the same pay band.
The labour market. Seniors are scarce and may take months to find; juniors are easier to hire.
Risk. One person is a single point of failure: if the senior leaves or falls ill, the capacity goes. Two people give redundancy.
The manager's time. Aditi's own time is a scarce input, and two juniors need more of it.
Step 6: the recommendation
Aditi might say: "I tagged six months of our work: about 35 per cent was senior-only, which is above the 20 per cent break-even over three years. On that evidence one senior produces about 35.5 units in three years for ₹84 lakh against about 27 for two juniors for ₹78 lakh, and the senior reaches full output in two months against six. But I do not want to lose the long-term benefits of growing juniors. I will hire one mid-level designer at about ₹18 lakh to take on the structured work, and a junior at ₹10 lakh in the second half of the year once the mid-level designer is settled, with mentoring written into the senior designer's goals. I will review the share of senior-only work every six months and the output of each hire at month six and month twelve."
What happened
This part of the case is an illustrative epilogue, not a real outcome.
Aditi's tagging showed that about 38 per cent of the work was senior-only, mainly research and cross-team decisions. She hired a mid-level designer at ₹17.5 lakh who reached full output in three months and took on about a third of the senior-only work with some coaching from the team's experienced designer. She added a junior seven months later. After a year, the team's delivery against its plan had risen from 78 to 94 per cent, and the experienced designer reported that mentoring took about 10 per cent of his time, less than he had feared because the junior was paired with the mid-level hire.
Key takeaways
The question is about the work: what share only a senior can do. Juniors can do none of it, so their output is capped at the routine share.
Count supervision. Two juniors cost ₹26 lakh with ₹6 lakh of supervision, and the break-even share of senior-only work fell from 40 to about 23 per cent in steady state and about 20 per cent over three years.
Ramp-up matters in the first year: at 30 per cent senior-only work, two juniors produced 8.72 units against the senior's 11.5.
Measure the share of senior-only work by tagging past work, and do not rely on intuition.
Consider the options between the two: a mid-level hire, a senior with a junior, a freelance senior for the hardest work or staged hiring.
The model leaves out quality, growth, retention, mix of experience, the labour market and risk. Juniors who grow can change the answer over five years.
Review the decision with data at six and twelve months.
Try this
Decide on a hire of your own. Set aside forty-five minutes.
1. Choose a team and a role to fill. List the work the new person or people would take, and tag each piece as routine or needing an experienced person. Compute the share that needs experience.
2. Write the cost of each option, including supervision, and the output of each when ramped up and how long the ramp takes.
3. Compute the steady output per rupee and the break-even share of experienced-only work. Use the simulator pattern.
4. Compute the cumulative output and the cost over 36 months for each option.
5. Design a third option between the two and compute its output per rupee. List two things the model leaves out.
6. Write a five-sentence recommendation: the hire, the share of experienced-only work you found, the cost per output, the main risk and when you will review.
A good result is a tagged list of work, a cost and output table for each option including supervision and ramp-up, a break-even share, a third option and a review plan. This completes the Careers and people cases in the Case Library.
Tags: Case study Hiring Team building Ramp-up Cost per output