Case 55: Prioritising a product backlog with limited engineers
A teaching case on choosing among eight features with 20 engineer-weeks: score each idea, find the best set and test how fragile the ranking is.
Every product team has more ideas than it can build. The ideas come from customers, from sales, from the founders and from the engineers themselves, and each one is argued for by someone who is sure it matters. The team's time is the scarce thing. A quarter has only so many engineer-weeks, and every week spent on one feature is a week not spent on another. A framework for scoring ideas does not remove the argument, but it makes the argument about the right things: how many people a feature reaches, how much it helps them, how sure the team is and how much it costs. This case gives you eight real-looking ideas and 20 engineer-weeks. You will practise scoring ideas with reach, impact, confidence and effort, choosing a set under a time limit, noticing when a ranking by score is not the same as the best set, and testing how much the answer depends on guesses that could be wrong.
This is a composite case. Swiftlist, its people and its features are invented for teaching, built on patterns common among consumer and small-business apps. No real company is described, and the scores are examples, not guidance on how to build any real product.
The decision
Nikhil Shah, head of product at Swiftlist, an app that helps small shops manage orders and invoices, has to give the engineering manager a plan for the next quarter. The team has 20 engineer-weeks available. The backlog has eight ideas, and each has a champion. Sales says a team-workspaces feature will unlock larger customers. Support wants bulk upload. The founder wants better search. Growth wants referral rewards. Nikhil has a score for each idea and a request: choose, and justify the choice in a form that the champions of the ideas not chosen can accept.
Background
The scoring method. Swiftlist uses a simple method called RICE. Each idea gets four numbers:
Reach: how many users it will affect in a quarter.
Impact: how much it moves the key measure for each user it reaches, on a scale from 0.25 (minimal) to 3 (massive). Here the measure is the contribution to retained, paying users.
Confidence: how sure the team is of its reach and impact estimates, as a percentage. 100 per cent means strong evidence, 50 per cent means a guess.
Effort: the engineer-weeks needed.
The RICE score is reach × impact × confidence ÷ effort. It is the expected value delivered per engineer-week.
The backlog. Estimates agreed with the team:
Idea · Reach · Impact · Confidence · Effort (weeks)One-tap reorder · 40,000 · 2.0 · 80% · 3
Smart search · 90,000 · 1.0 · 50% · 8
Referral rewards · 60,000 · 1.5 · 50% · 5
Dark mode · 70,000 · 0.25 · 100% · 2
Invoice export · 15,000 · 2.0 · 100% · 3
Onboarding checklist · 50,000 · 1.5 · 80% · 2
Team workspaces · 20,000 · 3.0 · 50% · 10
Bulk upload · 12,000 · 2.0 · 80% · 4
The total effort of all eight ideas is 37 engineer-weeks, almost twice the 20 available.
The numbers
Exhibit 1: scores
Idea · Expected value (reach × impact × confidence) · Effort · RICE score · RankOnboarding checklist · 60,000 · 2 · 30,000 · 1
One-tap reorder · 64,000 · 3 · 21,333 · 2
Invoice export · 30,000 · 3 · 10,000 · 3
Referral rewards · 45,000 · 5 · 9,000 · 4
Dark mode · 17,500 · 2 · 8,750 · 5
Smart search · 45,000 · 8 · 5,625 · 6
Bulk upload · 19,200 · 4 · 4,800 · 7
Team workspaces · 30,000 · 10 · 3,000 · 8
The checklist is cheap and reaches many people. One-tap reorder has the largest total expected value (64,000) but costs three weeks. Team workspaces has a large impact per user but low confidence and a high cost, so it ranks last.
Exhibit 2: filling 20 weeks
Taking ideas from the top of the list until the time runs out:
Idea · Effort · Weeks used · Expected valueOnboarding checklist · 2 · 2 · 60,000
One-tap reorder · 3 · 5 · 64,000
Invoice export · 3 · 8 · 30,000
Referral rewards · 5 · 13 · 45,000
Dark mode · 2 · 15 · 17,500
Bulk upload · 4 · 19 · 19,200
Total · · 19 weeks · 235,700
Smart search (8 weeks) and team workspaces (10 weeks) do not fit. The plan uses 19 of 20 weeks and delivers an expected value of 235,700. A check of every possible combination of the eight ideas confirms that this is the best set that fits in 20 weeks.
Exhibit 3: how fragile is the plan?
The scores are guesses. Nikhil tests three things that could change.
If the confidence in referral rewards is really 25 per cent, not 50 per cent. The best set becomes one-tap reorder, smart search, invoice export, the checklist and bulk upload, with an expected value of 218,200. Referral rewards and dark mode drop out and smart search comes in.
If the onboarding checklist takes 5 weeks, not 2. The best set loses dark mode and gains nothing else. It becomes one-tap reorder, referral rewards, invoice export, the checklist and bulk upload, with a value of 218,200 over 20 weeks.
If sales says team workspaces must ship because a large customer has made it a condition of a contract. Then it takes 10 of the 20 weeks, and the best remaining set (with 10 weeks left) is one-tap reorder, dark mode, invoice export and the checklist: total value 201,500, which is 34,200 lower than the unconstrained plan.
Questions to consider
1. Why does the onboarding checklist rank first although one-tap reorder has the bigger total expected value?
2. Why does team workspaces rank last? Is that a fair verdict on its value to the company?
3. The plan from the ranking is also the best set. Is that always true? When could ranking by score and choosing the best set differ?
4. Which assumptions in Exhibit 3 matter most for the plan? What would you do to check them?
5. How should the plan change if a large customer makes team workspaces a condition of a contract?
6. What would you recommend to the engineering manager, and how would you explain it to the sales head whose idea is not in the plan?
Analysis
Step 1: the score measures value per unit of the scarce resource
The RICE score divides expected value by effort. That is deliberate: engineering time is the constraint, so the useful measure is how much value each engineer-week buys. A feature with a large payoff and a large cost can be a worse buy than a smaller feature that is cheap.
The checklist shows it. Its total expected value, 60,000, is below one-tap reorder's 64,000, but it costs two weeks and not three, so it delivers 30,000 per week against 21,333. And team workspaces has the largest impact per user (3.0, "massive") but reaches only 20,000 users, has confidence of only 50 per cent and costs 10 weeks, so its score is 3,000 per week, a tenth of the checklist's.
The main lesson is that a framework forces every idea to answer the same four questions. An idea that is exciting but expensive and uncertain has to show why it should take ten weeks of a team that could deliver four other ideas in the same time.
Step 2: the score is a ranking tool, and the plan is a different thing
The plan fills 20 weeks. Taking ideas from the top of the ranking until the weeks run out gives six ideas and 19 weeks. Here that is the same as the best possible set, but it need not be. A ranking by score per week can leave weeks unused or miss a combination of larger items that sums to more. For example, if two ideas of 10 weeks each have a combined value higher than a larger set of small ideas, a greedy ranking would never find it. For a small backlog Nikhil can check every combination, as in the exhibit. For a long one he can use a spreadsheet or a small program.
A second reason to look beyond the ranking is dependencies and sequence. One idea may need another to be built first, or may be better launched together with another. A third is balance: a quarter of six small features and no bold bet may be sensible this quarter and wrong over a year.
Step 3: the scores are guesses, so test them
The inputs to RICE are estimates, and the most uncertain are impact and confidence. A single number such as "impact 1.5" hides how little anyone knows. The way to handle this is to test how the plan changes when the guesses change, and to spend effort on the guesses that matter.
Exhibit 3 shows that two plausible changes cut the plan's value from 235,700 to about 218,200, a loss of 7 per cent. In both cases the plan changes only in its less valuable members: referral rewards and dark mode, or dark mode. The core of the plan, the checklist, one-tap reorder and invoice export, stays, in every case. These three are robust to the guesses tested. That is useful: Nikhil can start them without waiting for further analysis.
The more fragile parts are the middle of the list, where referral rewards, smart search and bulk upload trade places. Nikhil should spend a little time getting better evidence on those: a quick test of referral rewards on 5 per cent of users, a survey of search complaints, a count of how many accounts use spreadsheets for bulk entry.
Step 4: the forced item
The most interesting case is team workspaces. The framework gives it the lowest score. But the sales head says a customer worth ₹3 crore a year will sign only if it ships. This is a constraint from outside the scoring model, and the scoring model can handle it in two steps. First, treat the item as chosen. Second, find the best set for the remaining weeks. The result is 201,500 of expected value against 235,700, a loss of 34,200.
What does that loss mean in rupees? The framework's units are abstract, but Nikhil can translate. If the base plan's value of 235,700 corresponds to, say, an extra 3,000 retained paying customers over the year, then 34,200 is about 430 customers, worth ₹9 to 11 lakh a year at a typical revenue of ₹2,000 to 2,500 a customer. The contract at ₹3 crore a year is thirty times larger. The framework did not say "never build team workspaces". It said that on the evidence in the table it is a poor buy unless there is a specific reason to build it. A ₹3 crore contract is that reason, and it should be recorded as the reason, so that the team does not later think that low-score features are always worth building when a salesperson asks.
This is the most important use of a scoring framework. It does not make the decision, but it makes the cost of an exception visible. If the sales head wants an item that costs 34,200 points, the conversation can be about whether the contract is worth that.
Step 5: what a framework cannot capture
RICE is a good discipline, and it has limits that Nikhil should state to the champions of unchosen ideas.
Strategic bets. A feature with low confidence today may open a new market. A scoring model that rewards confidence will under-invest in bold ideas. Some teams reserve a share of capacity, say 15 to 20 per cent, for bets.
Technical health. Paying down technical debt or improving reliability does not show up in reach and impact, but ignoring it slows everything later.
Learning. Cheap tests that reduce uncertainty may be worth doing even though their own score is low.
Interactions. The value of two features together may differ from the sum.
Gaming. When people know the formula, they inflate reach and confidence. The team should agree on evidence for each number and review estimates against outcomes afterwards.
A word on the people side. A scoring table is easier to defend than a preference, but it can also be used to avoid hard conversations. When the sales head hears that team workspaces ranks last, the right answer is not to hide behind the number but to ask what the sales team knows that the estimates lack: how many customers have asked, what they would pay and whether a smaller version would meet the need. Often the best result of a prioritisation meeting is a better estimate of a number that nobody had examined, and a smaller, cheaper version of the idea that gets built in three weeks and not ten.
Step 6: the recommendation
Nikhil might say: "We will build the onboarding checklist, one-tap reorder and invoice export first, 8 weeks in total, because they are robust to every assumption we tested. Then, with the remaining 12 weeks, we will start referral rewards behind a 5 per cent test, add bulk upload and dark mode, and drop smart search and team workspaces for this quarter. Sales: if a signed contract depends on team workspaces, bring it to me with the contract value and I will show you what it displaces. We will review the scores after the quarter against the real results, so the next round of estimates is better."
He should also share the table with the champions of ideas not chosen. A transparent comparison is much easier to accept than a decision that seems to come from preference.
What happened
This part of the case is an illustrative epilogue, not a real outcome.
Swiftlist built the checklist, one-tap reorder and invoice export in the first eight weeks. The checklist raised the share of new users who completed setup from 52 to 63 per cent, close to the estimate. One-tap reorder was used by 31 per cent of the 40,000 users it was expected to reach, below the 80 per cent confidence implied. The referral test on 5 per cent of users produced a weak response, and Nikhil replaced it with bulk upload and the first stage of search improvements. Sales brought a contract for team workspaces in the following quarter, and Nikhil scheduled it with an explicit note that it displaced two other projects.
Key takeaways
RICE scores an idea as reach × impact × confidence ÷ effort: expected value per unit of the scarce resource, engineer-weeks.
Cheap, wide, well-evidenced ideas rank high. The checklist scored 30,000, one-tap reorder 21,333 and team workspaces 3,000.
Fill the time with the best set, not just the top of the ranking. With 20 weeks the best set was six ideas using 19 weeks for a value of 235,700.
Scores are guesses. Test how the plan changes. Two plausible changes cut the value to 218,200, but the core of three ideas stayed.
Spend effort on the guesses that move the plan, such as a cheap test of referral rewards.
A forced item shows its cost: team workspaces displaced 34,200 points of value, which can be compared with the contract that requires it.
Reserve capacity for bets and technical health, which the formula ignores, and review the estimates against results.
Try this
Prioritise a backlog of your own. Set aside forty-five minutes.
1. List six to ten ideas for a product, a team's work or a personal project. Estimate reach, impact, confidence and effort for each, and write the evidence for each number.
2. Compute expected value and the score for each idea, using the simulator pattern, and rank them.
3. Fill a fixed capacity, and check by trying other combinations whether a different set is better.
4. Change the two or three most uncertain numbers and see how the plan changes. Mark the ideas that stay in every version.
5. Choose one idea that you would be forced to include for an outside reason, and compute what it displaces.
6. Write a five-sentence plan: the ideas, the order, the robust core, the assumptions you will check and how you will explain the unchosen ideas.
A good result is a scored backlog with evidence, a best set under a capacity, a sensitivity test, a cost for a forced item and an explanation you could give to the owner of an idea that was left out. Case 56 looks at what happens when the numbers used to run a product measure the wrong thing.
Tags: Case study Prioritisation RICE scoring Product management Trade-offs