Case 98: Steel prices jump 25 per cent, absorb, pass on or hedge?
A parts maker faces a 25 per cent rise in steel. Compare absorbing it, raising prices, index-linked contracts and hedging, and how much volume it can lose.
For a manufacturer, the price of the main raw material is both the largest cost and the one it controls least. A steel parts maker cannot negotiate with the market. When the price of steel jumps, its costs jump with it, and the company has three broad choices. It can swallow the increase and let profit fall. It can pass the increase on to its customers and risk losing some of them. Or it can arrange its business so that the next jump does not hurt: by writing prices that follow the cost of steel into contracts, or by locking in a price in advance. The right choice depends on how much of the cost is steel, how much of the business is exposed to fixed prices and how readily customers will accept an increase. In this case you play the chief financial officer of a component maker facing a sudden rise in steel. You will practise computing profit under four responses, finding the volume loss a price rise can absorb before it stops paying, and weighing a hedge as insurance against future price moves.
This is a composite case. Ironcast, its people and its figures are invented for teaching, built on patterns common among component makers that buy metals and sell to larger manufacturers. No real company is described, and no number here should be quoted as a fact about any real firm.
The decision
Shalini Gupta, chief financial officer at Ironcast, a maker of steel components for car makers, reads a commodity report on Monday morning: the price of the grade of steel Ironcast buys has risen 25 per cent in a month and analysts expect it to stay there for at least a year. Ironcast sells components under annual contracts, most with fixed prices, to a handful of large customers. The sales head says customers will not accept a rise. The production head says that without one the plant will make a loss on some products. Shalini has a model of the business and four options.
Background
The business before the rise.
· ₹ crore a yearRevenue · 200
Steel · 80 (40% of revenue)
Other costs that do not change with volume (staff, rent, depreciation) · 36
Other costs that change with volume (power, tools, freight) · 54
Profit · 30 (15% of revenue)
If steel rises 25 per cent, Ironcast's steel bill rises by ₹20 crore at the same volume, to ₹100 crore. Profit would fall from ₹30 crore to ₹10 crore, a fall of two thirds.
The contribution of volume. Revenue less the costs that change with volume is ₹66 crore (200 − 80 − 54, before the steel rise: after it, 200 − 100 − 54 = ₹46 crore). It is the money that each unit of volume brings in towards the fixed costs and profit. Losing 1 per cent of volume costs about ₹0.66 crore of it before the steel rise, and ₹0.46 crore after it.
The options.
A. Absorb the rise. Keep prices as they are. Volume is unchanged.
B. Raise prices by 10 per cent. That is just enough to recover the ₹20 crore of extra steel cost (10 per cent of ₹200 crore). Shalini expects customers to resist, and that Ironcast will lose 6 per cent of its volume as some orders move to competitors.
C. Index-linked clauses on 60 per cent of sales. For the customers who will agree, add a clause under which the price follows the steel price, with a lag of two months. On average over the year, those customers pay about 8.3 per cent more. The rest are absorbed. Volume falls by 1 per cent.
D. Index-linked clauses for all customers, with a three-month lag. The same, with every contract renegotiated. The average price rise is 7.5 per cent, volume falls by 1 per cent.
Hedging is a separate question about the future, and Shalini considers it afterwards.
The numbers
Exhibit 1: profit under each response
Response · Revenue · Profit · Profit marginBefore the rise · ₹200.0 crore · ₹30.0 crore · 15.0%
A. Absorb · ₹200.0 crore · ₹10.0 crore · 5.0%
B. Raise prices 10%, volume −6% · ₹206.8 crore · ₹26.0 crore · 12.6%
C. Index clauses on 60% of sales · ₹207.9 crore · ₹19.4 crore · 9.4%
D. Index clauses on all sales · ₹212.8 crore · ₹24.4 crore · 11.5%
Absorbing the rise leaves Ironcast with a profit of ₹10 crore, a third of what it was. Raising prices by 10 per cent restores most of the profit, ₹26.0 crore, even though 6 per cent of volume is lost, because the extra price is worth far more than the margin on the lost units. Index-linked contracts do almost as well if all customers accept them, ₹24.4 crore, and about half as well if only 60 per cent do.
Exhibit 2: how much volume can Ironcast lose?
The price rise is only worth it if it does not drive away too many customers. After the price rise, each 1 per cent of volume lost costs about ₹0.66 crore (revenue of ₹220 crore less steel of ₹100 crore and other variable costs of ₹54 crore, spread over all volume), while the price rise brings in ₹20 crore, so Ironcast can lose a great deal. The table gives profit under option B at other volume losses.
Volume lost after a 10% price rise · Profit6% (estimate) · ₹26.0 crore
10% · ₹23.4 crore
20% · ₹16.8 crore
30% · ₹10.2 crore
35% · ₹6.9 crore
Option B beats absorbing the rise, ₹10.0 crore, until Ironcast loses about 30 per cent of its volume. A rise of 10 per cent in price that cost 30 per cent of sales is no better than doing nothing. This is a surprisingly high figure, and it shows why price rises are often the right answer to a cost shock. Ironcast is in a high-contribution business, in which the price of each unit is much larger than the cost that changes with it, and a price increase is worth far more than the volume it loses. Its customers also face competitors who buy steel at the same price, which makes it harder for them to switch.
Exhibit 3: how big a rise, and how soon
The 10 per cent increase is the one that exactly recovers the cost. Shalini can choose other sizes. Assuming that for each 1 per cent on the price, 0.6 per cent of volume is lost:
Price rise · Volume lost · Profit5% · 3% · ₹18.3 crore
10% · 6% · ₹26.0 crore
15% · 9% · ₹33.2 crore
On these assumptions, each extra 5 per cent raises profit, so it would pay to raise prices by more than the cost of steel. That conclusion rests on a constant loss of volume per point of price, which is unlikely to hold: customers tolerate a rise that explains itself, such as a rise in steel, much more easily than one that looks like profiteering. A rise larger than the cost shock may look opportunistic, may drive buyers to look for second sources and may harm the long relationship.
Timing matters too. A price rise takes time to agree. If it arrives after three months, profit for the year is ₹22.0 crore instead of ₹26.0 crore, because the first quarter is absorbed. After six months, ₹18.0 crore. Each month of delay costs about ₹1.3 crore.
Exhibit 4: hedging as insurance
The responses above deal with a rise that has happened. A hedge is a way to protect against one that might. Ironcast could agree with a supplier or a bank, before the next rise, to buy 60 per cent of its next six months' steel at today's price. That is ₹24 crore of steel (60 per cent of half a year's ₹80 crore), for a premium of 2 per cent, ₹0.48 crore.
What steel does next · Gain or loss from the hedgeRises 25% · +₹5.52 crore
Stays flat · −₹0.48 crore
Falls 15% · −₹4.08 crore
A hedge is not a way to make money. In a rise it gains ₹5.5 crore, and in a fall it loses ₹4.1 crore, because Ironcast is committed to a higher price than the market. It reduces the swing in profit and gives time to adjust prices. It is worth having for a firm that cannot survive a bad year, and worth less for one with spare strength.
Questions to consider
1. Why does absorbing a cost rise cut profit so much more in percentage terms than the rise itself?
2. Why can Ironcast lose 30 per cent of its volume and still be no worse off than absorbing?
3. What makes customers accept or reject a price rise, and how should Ironcast present it?
4. What are the advantages of index-linked contracts for both sides?
5. What does a hedge do, and when would it be a mistake?
6. What would you recommend, and in what order would you act?
Analysis
Step 1: how a cost rise reaches profit
Steel is 40 per cent of Ironcast's revenue and profit is 15 per cent. A 25 per cent rise in steel, equal to 10 per cent of revenue, takes away two thirds of profit. This is operating leverage from the cost side: when a large cost rises and nothing else changes, the whole increase falls on profit, which is a small part of revenue.
That is why a cost shock cannot be absorbed for long. It is also why the right response is to restore the margin, not to hope the price of steel will come back. The question is how.
Step 2: the logic of passing it on
A price rise of 10 per cent brings in ₹20 crore at the same volume. What it costs is the volume that leaves. Each unit lost takes away its contribution, the price less the costs that change with volume. After the rise, the contribution on all volume is ₹66 crore (₹220 crore of revenue less ₹100 crore of steel and ₹54 crore of other variable costs), or about ₹0.66 crore for each 1 per cent of volume.
So the break-even volume loss is high. A 10 per cent price rise that costs 6 per cent of volume turns ₹10 crore of profit into ₹26 crore. It would take a loss of 30 per cent to wipe out the gain. Even a very pessimistic sales head, who expects to lose 20 per cent, is predicting ₹16.8 crore of profit, 68 per cent more than absorbing the rise.
This conclusion is specific to a business with a large gap between price and variable cost. A business with a thin contribution, such as a trader that buys and resells, has a much lower break-even loss, and a price rise there is riskier.
Step 3: why customers might accept it
Ironcast's customers are car makers who buy steel parts from several suppliers, all of whom face the same steel price. This is the best case for a price rise: it is industry-wide, not specific to Ironcast, and customers can see it in published steel prices. A supplier that raises prices to cover a visible cost increase is not being greedy.
Shalini can improve her chances in several ways.
Show the evidence. Present the steel price index and the share of steel in each product's cost, so that the rise is clearly a pass-through of cost and not a margin grab.
Ask for the cost, not more. A rise that recovers the actual cost, and no more, is easier to accept and to defend.
Move quickly. Customers who hear of the rise from the market are more understanding than those who hear it late. Each month of delay costs about ₹1.3 crore.
Offer something. A longer contract, a volume commitment or a promise to reduce prices when steel falls make acceptance easier.
Segment. Customers that cannot easily switch, because the part is custom-made or qualified through a long process, will accept more than those that can.
Step 4: index-linked contracts
An index-linked price follows a published steel price, with a formula and a lag. When steel rises, the price rises automatically. When steel falls, the price falls. It removes the need to renegotiate every time, and removes the argument about whether a rise is justified.
For Ironcast, the benefit is protection. Under option D, the profit is ₹24.4 crore, within ₹1.6 crore of the price-rise option, and it is protected against the next move as well. For customers, the benefit is fairness and predictability: they pay a price tied to a visible number, and they benefit when steel falls.
The costs are in the transition. Customers who have fixed-price contracts will not give them up willingly, and may ask for a cap or a floor. Ironcast bears the lag: with a two-month lag, it absorbs about one sixth of a rise before it is passed on. And the contract must name the steel index carefully: a published price for the grade Ironcast actually buys, so that the formula tracks its real cost.
Option C shows what happens if only part of the customer base agrees. Profit is ₹19.4 crore, between absorbing and the full solution. This suggests a sequence: start with the customers most willing to agree, and use the first results to persuade the others.
Step 5: what a hedge does and does not do
A hedge is not an answer to the rise that has happened, and Ironcast cannot buy last month's price now. It is a policy for the future. By locking in the price of part of its steel for the next six months, Ironcast gives itself time: if steel rises, its costs rise later and more slowly, and it can adjust prices without a crisis.
The cost is real. In the table, the hedge loses ₹4.1 crore if steel falls 15 per cent and costs ₹0.5 crore of premium even if nothing happens. A hedge can also be a trap. A company that hedges more than it needs, or hedges in a way that does not match its real exposure, can lose money and create a new risk. A useful rule is to hedge only the part of the exposure that Ironcast cannot pass on to customers, and only for a period it can match with its contracts.
The best protection is to reduce the exposure in the first place: through index-linked pricing, shorter contracts and a diverse set of suppliers. A hedge can then serve as a bridge while the contracts change.
Step 6: the recommendation
Shalini might say: "Raise prices by about 10 per cent now, with the steel index as evidence, and use the negotiation to move customers to index-linked contracts. On our figures, absorbing the rise cuts profit from ₹30 crore to ₹10 crore. A 10 per cent price rise, even if it loses 6 per cent of volume, restores profit to ₹26 crore, and it would take a volume loss of 30 per cent to leave us no better off than doing nothing. Each month of delay costs about ₹1.3 crore. Start with the customers who have the least alternative, offer a contract that falls with steel, and aim to put all contracts on an index with a lag of no more than three months, which would earn about ₹24 crore and protect us against the next rise. Consider a hedge of about 60 per cent of six months' steel only while contracts are being changed."
What happened
This part of the case is an illustrative epilogue, not a real outcome.
Ironcast presented customers with the steel index and its cost breakdown and asked for 9 per cent. Four of its six largest customers accepted 8 per cent from the first of the next month, and a fifth agreed to an index-linked contract with a three-month lag. The sixth, which had an alternative supplier, took six months and a 6 per cent rise. Overall, prices rose by about 7.8 per cent over the year, volume fell by 3 per cent and profit was about ₹24 crore. Steel fell 10 per cent in the second year, and the customers on index-linked contracts received a price reduction without asking. Shalini reported that most of Ironcast's sales were on index-linked terms by the end of year 2.
Key takeaways
Steel was 40 per cent of revenue and profit 15 per cent, so a 25 per cent steel rise took two thirds of profit: from ₹30 crore to ₹10 crore if absorbed.
A 10 per cent price rise restored profit to ₹26.0 crore even with 6 per cent of volume lost, and beat absorbing the rise until about 30 per cent of volume was lost.
A price rise works well in a business with a large gap between price and variable cost, and when the cost rise is industry-wide and visible.
Each month of delay in raising prices cost about ₹1.3 crore.
Index-linked contracts earned ₹24.4 crore if all customers accepted and ₹19.4 crore if 60 per cent did, and they protected against the next move.
A hedge reduces the swing in profit and buys time. It gained ₹5.5 crore in a rise and lost ₹4.1 crore in a fall. Hedge only the exposure you cannot pass on.
Try this
Plan a response to a cost shock in a business of your own. Set aside forty-five minutes.
1. Choose a business whose main input is volatile in price. Write revenue, the cost of the input, other costs that do not change with volume and other costs that do.
2. Choose a rise in the input price. Compute profit if it is absorbed.
3. Compute the price rise that recovers the extra cost, and profit if it is made and some volume is lost. Find the volume loss at which the rise stops being worth it.
4. Design an index-linked contract, with an index, a formula and a lag, and compute profit if a share of customers accepts it.
5. Estimate the cost and benefit of a hedge in a rise, a flat market and a fall.
6. Write a five-sentence recommendation: the response, the numbers, the volume loss you can bear, how you would present it to customers and what you would do to reduce your exposure next time.
A good result is a profit table for four responses, a break-even volume loss, a test of the size and timing of a price rise, an index-linked contract and a view of a hedge. Case 99 ends this set with a decision about replacing people with a machine.
Tags: Case study Manufacturing Raw materials Pricing Hedging